RCER-2025 applies in Jubail, Yanbu, Ras Al-Khair and Jazan instead of the NCEC regulations. Here is what it asks of your facility, with the volume, section and page for every point.
Approved by the Royal Commission for EIA, groundwater and noise studies.
Request a proposalLook something up
How an RC permit is issued
From screening to the permit to operate.
- 1
Screening
Submit the Environmental Screening Questionnaire with the Site Allocation Request. The RC sets the facility category.RCER-2025 Vol. II, Section 1.3, page 3
- 2
Application
Submit the permit application package, with an EIA for Second and Third Category facilities or an EMP for First Category.RCER-2025 Vol. II, Section 1.3.1, page 3
- 3
Permit to construct
The RC issues the EPC. The lease is signed only after the EPC is issued.RCER-2025 Vol. II, Section 1.3.1(v), page 4
- 4
Permit to operate
Apply at least 60 working days before start-up. The RC inspects, and the EPO lasts five years.RCER-2025 Vol. II, Section 1.3.2(i) and (vii), page 4, and Glossary, Day, page vi
The 24 application forms
What each form covers, what to attach and the mistakes that delay approval.
General
Air
Water
- PA-W1Sanitary wastewater
- PA-W2Treated sanitary wastewater to the Red Sea
- PA-W3Industrial wastewater to a treatment facility
- PA-W4Treated industrial wastewater to the Red Sea
- PA-W5Cooling water, brine and variance streams
- PA-W6Cooling towers
- PA-W7Stormwater and run-off
- PA-W8Ballast water
- PA-W9Groundwater monitoring wells
Hazardous materials and waste
Other activities and renewal
Guides
Regulations we cite
Every page in this library is written from the three volumes of RCER-2025. A reference such as RCER-2025 Vol. I, 1.3.6, page 6 means Volume I, clause 1.3.6, on printed page 6. NCEC texts are listed on the NCEC regulations page.
- Royal Commission Environmental Regulations 2025, Volume I, Regulations and Standards
- The environmental standards and the rules for permits to construct (EPC) and operate (EPO), cited by clause. Cited as RCER-2025 Vol. I.
- Royal Commission Environmental Regulations 2025, Volume II, Environmental Permits and Licenses Program
- The permit application process, the screening questionnaire and the application packages. Cited as RCER-2025 Vol. II.
- Royal Commission Environmental Regulations 2025, Volume III, Penalty System and Service Charges
- Royal Commission penalties and service charges. Cited as RCER-2025 Vol. III.