- Home
- Environmental studies
- Ecology and biodiversity
Ecology and biodiversity
We survey plants, animals and habitats on land and at sea, and advise on how to avoid, reduce and offset the impacts of your project.
Request a proposalOverview
We are an NCEC Type A licensed environmental consultancy, and our ecology and biodiversity surveys record the plants, animals and habitats on and around your site, on land and at sea. Our own field teams collect the data your EIA, tree clearance licence or marine permit needs, and we turn the findings into practical mitigation.
Ecology surveys identify the species and habitats on and around a site, including protected species and sensitive areas. Their findings shape the EIA, the layout of the project and the mitigation it commits to.
We also survey and record trees and shrubs where clearance is planned, because cutting or moving them on state land with wild plants or in protected areas needs a prior licence.
Ecology findings decide which authorities your project deals with. Vegetation cover lands are all state-owned land with wild plants, including rangelands, wetlands, dunes, valleys and coastal areas, and NCVC reviews the EIAs of activities on them in coordination with NCEC. A permit to remove or move local trees needs a technical study of the number of trees, the uprooting and transport methods and the receiving site, and an undertaking not to move rare and endangered plants.Logging reg. Art. 1. Vegetation reg. Art. 3(19). NCVC permit rules, Annex 1
At sea, licences for activities involving marine wildlife and coral, such as collecting, moving or transplanting coral, come from the National Center for Wildlife or the General Foundation for the Conservation of Coral Reefs and Turtles in the Red Sea. The Foundation also approves EIAs referred to it for projects affecting coral reefs, turtles or nesting sites.Marine reg. (1448H) Art. 7, First (3) and Art. 3, Fourth (4) and (12)
In brief, from our library
On state-owned land with wild plants and inside protected areas, cutting, uprooting or moving a tree or shrub needs a prior licence or permit. A tree is any woody plant 1.5 m or taller and a shrub is 0.5 m to under 1.5 m. Under the 2024 Logging penalty table, cutting a tree on vegetation cover lands without a licence costs 10,000 riyals per tree for a first offence, and 20,000 riyals per tree in a protected area, while the 2024 protected areas table sets 10,000 to 20,000 riyals per tree for the same act. For trees on private plots, NCVC's 2024 permit rules include a permit to remove or move local trees from private holdings.Environmental Law (Royal Decree M/165)
Read the full guide: Can we cut or remove trees on our project site?
When you need it
- Your EIA needs flora, fauna and habitat data.NCEC guide LO-1-M-005, technical requirements
- You plan to clear vegetation. A tree is any woody plant that rises 1.5 m or more above the soil.Logging reg. Art. 1
- Your works affect the coast or the sea, where marine habitats must be assessed.Marine reg. (1448H)
What is included
- Land status checkWhether each part of the site is state land with wild plants, a protected area or private title, which decides the licensing route.
- Protected and rare speciesSearches for protected, rare and endangered plants and animals that need avoidance or special handling.
- Tree and shrub countsEach plant recorded by species, height and location, measured against the regulatory tree and shrub definitions.
- Fauna recordingCamera traps, transects and direct observation, timed to the species groups that matter for the site.
- Coastal and intertidal habitatsMangrove, intertidal, seagrass and coral habitat mapping for coastal and marine works.
- Relocation supportReceiving site details, tree numbers and methods for NCVC tree removal or relocation permits.
- Mitigation and follow-upAvoidance, reduction and offset measures, with the follow-up monitoring written into the EIA and the site plan.
What we deliver
- Flora and habitat surveysSpecies lists, habitat maps and sensitive areas.
- Fauna surveysIncluding camera trapping and protected species.
- Tree surveysRecords that support clearance and relocation licences.
- Marine ecologySeabed, coral and seagrass surveys.
- Biodiversity assessmentImpacts and the mitigation hierarchy for your project.
How we work
Desk review
Known species, protected areas and habitats around the site.
Field survey
Seasonal timing where it matters for the species involved.
Assessment
Impacts set against the sensitivity of what we found.
Mitigation
Practical measures written into the EIA and the site plan.
Sectors we serve
Frequently asked questions
Do I need an ecology survey for my EIA?
Most EIAs need flora, fauna and habitat data, and the site's ecology also affects how the project is assessed. Endangered species count as sensitive receptors, and protected areas, wetlands, important bird habitats and mangroves count as sensitive areas. A site in, or within 500 m of, these areas needs a detailed EIA, so an early survey avoids surprises later.NCEC guide LO-1-M-005, technical requirements. Permits reg. Art. 1 and Art. 6, Second (6)
Can we clear trees inside a protected area?
Only with a prior permit. Every activity inside a protected area managed or supervised by the National Center for Wildlife needs its prior permit or licence, and cutting, uprooting or moving trees or plants there is prohibited. NCW decides within 10 working days of a complete application and may extend this by 5. Acting without a permit carries 10,000 to 2,000,000 riyals.Protected areas reg. Art. 2, Art. 7(1) and (5), Art. 9(12) and Table (1) (2024) item 3
What does a tree survey record?
We record each tree and shrub in the clearance area with its species, height, condition and location, and photograph it. Height matters because the regulation defines trees and shrubs by it. The records support the NCVC licence or permit application and give a reliable count of the plants to be removed or relocated.
When is the best time to do an ecology survey?
It depends on the species. Many plants and animals are easier to record in particular seasons, so we time field visits to the groups that matter for your site. On coastal and marine projects, the permit application must disclose risks to wildlife during breeding, migration and nursing seasons, so the survey needs to cover those periods.Marine reg. (1448H) Art. 7, Third (1)
What happens if a protected species is found on site?
Under the marine and coastal regulation, persons and activities must notify the National Center for Wildlife or the Red Sea Foundation immediately if an endangered or protected species is caught as bycatch, trapped or stranded within their site. On land, we record the finding and propose avoidance or relocation measures for the EIA and the site plan.Marine reg. (1448H) Art. 5, First (8)
Send us the location and what you plan to build. We reply with the likely route, what it involves and a proposal.
Guides on this topic
References
Show all 10 references
- NCEC guide LO-1-M-005, technical requirements
- Logging reg. Art. 1
- Marine reg. (1448H)
- Environmental Law (Royal Decree M/165)
- Logging reg. Art. 1. Vegetation reg. Art. 3(19). NCVC permit rules, Annex 1
- Marine reg. (1448H) Art. 7, First (3) and Art. 3, Fourth (4) and (12)
- NCEC guide LO-1-M-005, technical requirements. Permits reg. Art. 1 and Art. 6, Second (6)
- Protected areas reg. Art. 2, Art. 7(1) and (5), Art. 9(12) and Table (1) (2024) item 3
- Marine reg. (1448H) Art. 7, Third (1)
- Marine reg. (1448H) Art. 5, First (8)
How to read these references 7 texts cited
- NCEC guide LO-1-M-005
- A guide to issuing and renewing environmental permits for the construction and operation of activities (NCEC, LO-1-M-005)
- Logging reg.
- Executive Regulation for Logging
- Marine reg. (1448H)
- Executive Regulation for the Sustainable Management of the Marine and Coastal Environment (1448H update)
- NCVC permit rules
- Rules for licences and permits on vegetation cover lands (2024), National Center for Vegetation Cover and Combating Desertification (NCVC)
- Protected areas reg.
- Executive Regulation for the Protected Areas
- Art. 7(4)(b) means Article 7, paragraph 4, item (b).
- First, Second and Third are the numbered parts some articles are divided into. The Arabic texts write them أولاً، ثانياً، ثالثاً (meaning first, second, third).
- H after a year marks the Hijri (Islamic calendar) year. 1446H ran from July 2024 to June 2025.
Every text we cite is listed on our regulations page.
Need help with this? Talk to our team.