Do coastal and marine works need a licence under the 2026 marine regulation?

Which coastal and marine activities need a permit or licence under the 1448H marine and coastal regulation, how applications are decided and how the new penalty system works.

NCEC rules. 8 min read.

Short answer

Yes. The 1448H marine and coastal regulation, in force since its publication on 21 August 2026, bans any activity affecting the marine and coastal environment without an NCEC environmental permit, including dredging, reclamation, breakwaters, coastal construction and treated wastewater discharge. Licences issued by the competent authority under the regulation are decided within 30 working days of a complete application, extendable by 10 working days, while the NCEC permit itself follows the permits regulation. Unlicensed works are a non-serious violation with a 30 day warning, then fines from 50,000 to 200,000 riyals for a first offence rising to 500,000 to 2,000,000 riyals for a third, scaled by business size. Not notifying NCEC immediately of a spill carries a fine of 10,000 to 1,000,000 riyals.

Key terms used in this guide 11 terms
Compensation
Monetary amount paid by the person who causes the damage, pollution or environmental degradation, to compensate for or eliminate the resulting deterioration. It includes rehabilitation expenses if the person causing the damage did not carry out the rehabilitation. Arabic: التعويضات (meaning “the compensations”) Aqueous reg. Art. 1
Competent authority
The Ministry, any of the national centres for the environment sector, or the Public Foundation for the Conservation of Coral Reefs and Turtles in the Red Sea, each within its mandate and as the regulations set. Council of Ministers Decision 406 added the Foundation to the Environmental Law definition. The Audit regulation (1446H) uses the same definition. Arabic: الجهة المختصة (meaning “the competent (specialised) authority”) Env Law Art. 1 as amended by Council of Ministers Decision 406 (1445H), Third, Audit reg. (1446H) Art. 1
Environmental audit study
The study that Category 2 and 3 activities, and any activity NCEC names in a reasoned decision, submit with the renewal of the permit to operate. It is prepared by an NCEC licensed provider using the structure in Appendix 1 of the Audit regulation. The 1446H regulation no longer defines the term. Arabic: دراسة التدقيق البيئي (meaning “environmental audit study”) Audit reg. (1446H) Art. 5 and Appendix 1
Environmental impact assessment (EIA) study
Study aimed at determining, estimating and evaluating the environmental impact of any activity classified by the Center as category 2 or 3, with the objective of incorporating environmental considerations into the final design of the activity, along with economic, social and security considerations, and identifying the necessary alternatives and measures to protect the environment. Arabic: دراسة تقييم الأثر البيئي (meaning “study of the assessment of the environmental impact”) Permits reg. Art. 1
Environmental management plan (EMP)
Measures taken by the person to ensure and sustain environmental compliance. It is submitted as part of the procedures to obtain the environmental permit. Arabic: خطة الإدارة البيئية (meaning “the environmental management plan”) Permits reg. Art. 1
Environmental permit (general)
Document issued by the Center to a person before undertaking an activity. Arabic: التصريح (meaning “the permit (authorisation)”) Permits reg. Art. 1
Self plan (emergency preparedness and response)
Measures to manage an activity's or facility's internal environmental emergencies. They cover preparedness for the environmental risks that threaten it and the steps after an emergency or disaster, including rehabilitation of the affected areas. Arabic: الخطط الذاتية (meaning “the self plans (own plans)”) Emergency reg. Art. 1
Serious violation
A violation involving acts stipulated in Article 35 of the Environmental Law, acts that lead to environmental degradation, or acts that harm sensitive receptors or environmentally sensitive areas. Its penalty is proportional to the damage and is estimated by a committee of experts formed by the NCEC CEO. Arabic: المخالفات الجسيمة (meaning “the grave violations”) Permits reg. Art. 11(1) to (3)
Service provider
A person licensed by the competent authority to provide environmental services. The Audit regulation uses the singular مقدم الخدمة (meaning the service provider) for a person licensed by the Center. Arabic: مقدمو الخدمات (meaning “the service providers (those who provide the services)”) SP reg. (1446H) Art. 1 and Audit reg. (1446H) Art. 1
Treated wastewater
Wastewater emerging from a treatment plant or a treatment process, which was treated to reduce the adverse environmental impact in compliance with specific environmental standards and requirements. Arabic: مياه الصرف المعالجة (meaning “treated drainage water”) Aqueous reg. Art. 1
Wastewater
Water whose use has changed its color, taste, odor, or level of health or environmental security. This includes water used for health, industrial or agricultural purposes, including cooling water and water from desalination plants (brine). Arabic: مياه الصرف (meaning “drainage water”) Aqueous reg. Art. 1

All 49 terms in the NCEC glossary

On this page
  1. What did the 1448H regulation replace, and when did it take effect?
  2. Who is the competent authority?
  3. Which activities need a permit or licence?
  4. How are applications decided, and can a refusal be challenged?
  5. What are your duties while the works run?
  6. How does the penalty system work?
  7. What are the key fines for coastal projects?
  8. What can go wrong?

What did the 1448H regulation replace, and when did it take effect?

Ministerial Decision 481531028 dated 20/2/1448H approved an updated Executive Regulation for the Sustainable Management of the Marine and Coastal Environment. It was published in the Umm Al-Qura gazette on 21 August 2026 and applies from the date of publication.Decision 481531028 (1448H)

It replaces the earlier regulation issued by Ministerial Decision 25964/1/1443 dated 17/1/1443H. It also replaces the penalty table issued by Decision 15029095 dated 4/2/1446H, one of the 2024 penalty table decisions.Decision 481531028 (1448H)

The regulation covers the marine and coastal environment within the Kingdom. This includes islands, internal waters, the territorial sea, their seabed and subsoil, and other sea areas where the Kingdom has sovereign rights or jurisdiction.Marine reg. (1448H) Art. 2

It now defines a day as a full calendar day including weekends and holidays, and a working day as an official working day. Check which one each deadline uses.Marine reg. (1448H) Art. 1

Who is the competent authority?

The regulation defines the competent authority as the Ministry, any of the national environmental centres, or the General Foundation for the Conservation of Coral Reefs and Turtles in the Red Sea, each within its mandate.Marine reg. (1448H) Art. 1

Council of Ministers Decision 406 dated 14/5/1445H added the Foundation to the same definition in Article 1 of the Environmental Law.Decision 406 (1445H)

Who you deal with depends on the activity:

  • NCEC: environmental permits for activities affecting the marine and coastal environment, pollution monitoring, inspection and review of self emergency plans.Marine reg. (1448H) Art. 3, First
  • National Center for Wildlife or the Foundation: licences for activities involving marine wildlife and coral, such as fishing, coral collection or transplanting and interaction with wildlife.Marine reg. (1448H) Art. 7, First (3)
  • The Foundation: permits on coral reefs and turtles in the Red Sea, and approval of EIAs referred to it for projects affecting coral reefs, turtles or nesting sites.Marine reg. (1448H) Art. 3, Fourth (4), (12)
  • National Center for Vegetation Cover: licences for coastal vegetation work, including mangroves.Marine reg. (1448H) Art. 7, First (4)

Which activities need a permit or licence?

Article 7 bans any activity affecting environmental media in the marine and coastal environment without an NCEC environmental permit under the permits regulation. It gives 16 examples, including:Marine reg. (1448H) Art. 7, First (1)

  • Quarrying rock and gravel, and removing beach sand and marine sediments.Marine reg. (1448H) Art. 7, First (1)(a), (b)
  • Infilling, excavation, dredging and shore reclamation.Marine reg. (1448H) Art. 7, First (1)(c)
  • Building or removing breakwaters, sea walls, structures that change the natural coastline, and permanent or temporary marine platforms.Marine reg. (1448H) Art. 7, First (1)(d), (e)
  • Any coastal construction or demolition work.Marine reg. (1448H) Art. 7, First (1)(f)
  • Exploration, energy, mining, transport and port, tourism and aquaculture activities.Marine reg. (1448H) Art. 7, First (1)(g) to (l)
  • Discharging treated wastewater, and installing or moving mooring buoys.Marine reg. (1448H) Art. 7, First (1)(m), (n)

A licence from the National Center for Wildlife or the Foundation is needed for wildlife activities. These include collecting or moving coral, placing artificial reefs, and coral nurseries and transplanting.Marine reg. (1448H) Art. 7, First (3)

A separate licence is needed before installing any fixed or mobile monitoring network for water quality, wildlife, coral or leak detection. This does not apply where the network is itself a requirement of the environmental permit.Marine reg. (1448H) Art. 7, Fifth (3)

A licensed change to the natural coastline does not change how the Environmental Law or the regulation applies.Marine reg. (1448H) Art. 7, First (2)

How are applications decided, and can a refusal be challenged?

The competent authority sets the conditions and documents for each licence. It decides a complete application within 30 working days of all requirements being met and may extend this by 10 working days.Marine reg. (1448H) Art. 7, Second (1), (2)

The licence states its validity period and any conditions. The fee is collected before the licence is issued or renewed.Marine reg. (1448H) Art. 7, Second (3), (4)

A refusal must give reasons. The applicant can object to the competent authority with all supporting documents, and a decision on the objection is due within 30 working days of filing.Marine reg. (1448H) Art. 7, Second (5)

The regulation does not list specific grounds for refusal and does not set a deadline for filing the objection.Marine reg. (1448H) Art. 7, Second (5)

Build the timeline in

The licence decision clock only starts when the application is complete. Allow for document requests, the possible extension and the separate NCEC permit process before mobilising marine equipment.

What are your duties while the works run?

Holders must comply with the conditions of their permit or licence. Breaching them is a serious violation with fines of 5,000 to 200,000 riyals.Marine reg. (1448H) Art. 7, Second (6) and Table 1, row 44

If the competent authority asks, based on the activity's nature or risk, you must install, run and maintain monitoring for marine water quality, early leak detection and the condition of wildlife and coral. This applies in particular to:Marine reg. (1448H) Art. 7, Second (7)

  • Mineral, oil and gas exploration or extraction.Marine reg. (1448H) Art. 7, Second (7)(a)
  • Coastal infrastructure and energy production.Marine reg. (1448H) Art. 7, Second (7)(b)
  • Coastal and marine tourism, aquaculture and fishing.Marine reg. (1448H) Art. 7, Second (7)(c), (d)
  • Maritime transport and ports.Marine reg. (1448H) Art. 7, Second (7)(e)

When you apply for the permit, you must fully disclose any risks to wildlife and habitats in the EIA, environmental management plan or audit study. This includes risks during breeding, migration and nursing seasons.Marine reg. (1448H) Art. 7, Third (1)

If serious risks to wildlife were not adequately covered, the National Center for Wildlife or the Foundation can require extra measures. Where continuing the activity could cause serious harm to wildlife or habitats, the competent authority can also restrict, suspend or temporarily stop it after coordinating with the supervising authority. The regulation says this is a preventive measure, not a penalty.Marine reg. (1448H) Art. 7, Third (2) to (4)

You must notify NCEC of any oil or harmful substance spill, lost cargo, incident with a possible environmental effect or breach of the regulation. You must also immediately take measures to contain and treat it.Marine reg. (1448H) Art. 4(5)

Vessels must report any collision or accidental contact with coral reefs or marine wildlife immediately, and this report counts as voluntary disclosure. Not reporting such an incident is a separate violation.Marine reg. (1448H) Art. 6(4), (5)

Persons and activities must notify the National Center for Wildlife or the Foundation immediately if an endangered or protected species is caught as bycatch, trapped or stranded within their site.Marine reg. (1448H) Art. 5, First (8)

The regulation bans discharging untreated wastewater, waste, toxic or hazardous chemicals, oils, fuel or contaminated sediments into the marine and coastal environment.Marine reg. (1448H) Art. 4(1) to (3)

It also bans publishing any data, reports or studies on the marine and coastal environment without written approval from the Ministry. In practice, this covers baseline survey and monitoring results used in public reports or marketing.Marine reg. (1448H) Art. 7, Fifth (8)

Table 1 of the marine regulation has no row specific to this ban. Environmental service providers face a separate ban under their own regulation, with fines of 5,000 to 1,000,000 riyals.SP reg. (1446H) Art. 9(12) and Table 1, row 13

How does the penalty system work?

A violation is serious if it involves acts in Articles 35 or 40 of the Environmental Law, or if it harms the marine or coastal environment or any of its living or non-living parts.Marine reg. (1448H) Art. 1

The fines in Tables 1 and 3 are maximum limits. Serious fines are assessed on the degree of damage, the environmental importance and size of the affected site, and the economic and social effects.Marine reg. (1448H) Art. 8(1)(a), (d)

Non-serious violations in Table 1 start with a warning and a period to correct. For non-serious violations, individuals pay 25 percent of the Table 1 amount and businesses pay a share set by size in Table 2:Marine reg. (1448H) Table 1 and Art. 8(1)(b), (c)

Micro establishment25 percent
Small establishment50 percent
Medium establishment75 percent
Large establishment100 percent

For non-serious violations in Table 1, the centre concerned may issue more than one warning, extend the period or defer the fine if correction needs more time, provided there are acceptable technical reasons and the person keeps taking corrective action.Marine reg. (1448H) Art. 8(1)(g)

The penalty doubles if the same violation is repeated within one year of the earlier penalty decision becoming final. Cases under Article 40(2) of the Environmental Law are excluded.Marine reg. (1448H) Art. 8(1)(h)

The competent authority may give a grace period to correct a violation before penalising it if the violator voluntarily discloses or self-reports it. This follows controls approved by the Minister or the relevant board chair.Marine reg. (1448H) Art. 8(1)(f)

In every case, the violator must also correct the violation, repair the damage and pay compensation.Marine reg. (1448H) Art. 8(1)(e)

Table sourceMarine reg. (1448H) Table 2

What are the key fines for coastal projects?

The Table 1 rows that matter most for coastal construction and operation are:Marine reg. (1448H) Table 1

Art. 7 works without a licence or permit (row 43)Non-serious. Warning, 30 days. Then 50,000 to 200,000, 200,000 to 500,000, 500,000 to 2,000,000
Not notifying NCEC immediately of a spill or lost cargo (row 35)Serious. 10,000 to 1,000,000
Not reporting contact or collision with coral or wildlife (row 36)Serious. 10,000 to 500,000
Not containing spills (row 37)Serious. 50,000 to 5,000,000
Damaging coral reefs or sponges (row 17)Serious. From 5,000 up to the Table 3 value
Disposing of waste (row 40)Serious. 2,000 to 500,000
Disposing of hazardous waste (row 41)Serious. 50,000 to 20,000,000
Monitoring network without a licence (row 48)Non-serious. Warning, 30 days. Then 5,000, 10,000, 25,000 per network or station

Table 3 sets the maximum for all coral species at 200,000 riyals per cubic metre, and for sponges at 10,000 riyals per cubic metre.Marine reg. (1448H) Table 3, rows 7 and 8

Moving or transplanting coral without approval is a separate serious violation at 50,000 to 100,000 riyals per cubic metre.Marine reg. (1448H) Table 1, row 19

Discharges of untreated wastewater, or of treated wastewater without a permit, are fined under the aqueous media regulation rather than the marine table.Marine reg. (1448H) Table 1, rows 38 and 39

In practice, a small business fined under row 43 pays half of the printed amount, because Table 2 sets 50 percent for small establishments.Marine reg. (1448H) Art. 8(1)(c) and Table 2

Table sourceMarine reg. (1448H) Table 1

What can go wrong?

Most problems come from using the old marine rules or starting marine works before the paperwork is in place.

What can go wrong
  • Using a copy of the 1443H regulation or the 2024 penalty table gives the wrong fines. The 2024 table classed unlicensed coastal activities as serious at 5,000 to 200,000 riyals, which the 1448H row 43 has replaced.Marine reg. Table 1 (2024), row 37
  • Starting dredging, reclamation or a breakwater before the permit is issued exposes the project to row 43 fines of up to 2,000,000 riyals for a third offence, plus correction and compensation.Marine reg. (1448H) Table 1, row 43
  • Delaying a spill report while you assess the spill risks a fine of 10,000 to 1,000,000 riyals. This is separate from fines of up to 5,000,000 riyals for not containing it.Marine reg. (1448H) Table 1, rows 35 and 37
  • A work boat that touches coral and does not report it commits a separate violation, while a prompt report counts as voluntary disclosure.Marine reg. (1448H) Art. 6(4), (5)
  • Leaving wildlife risks out of the EIA or audit study can lead to extra measures, restriction or temporary suspension. Not complying with a suspension costs 50,000 to 500,000 riyals.Marine reg. (1448H) Art. 7, Third and Table 1, row 46
  • Installing water quality buoys or loggers without a licence, where they are not a permit requirement, is a row 48 violation.Marine reg. (1448H) Table 1, row 48
  • Publishing survey results without the Ministry's written approval breaches the regulation.Marine reg. (1448H) Art. 7, Fifth (8)
  • Counting a deadline in working days when the regulation says days, or the reverse, can make you late.Marine reg. (1448H) Art. 1
Planning dredging, reclamation or other coastal works?

Hills & Field prepares marine and coastal permit applications, baseline and wildlife surveys and monitoring programmes under the 1448H regulation.

Our service: Ecology and biodiversity

Talk to our team

References

Each small number in this guide shows the article or section that point comes from. Hover over or tap a number to see it, or open the full list below.

Show all 51 references and the 5 regulation texts
  1. Decision 481531028 (1448H)
  2. Marine reg. (1448H) Art. 2
  3. Marine reg. (1448H) Art. 1
  4. Decision 406 (1445H)
  5. Marine reg. (1448H) Art. 3, First
  6. Marine reg. (1448H) Art. 7, First (3)
  7. Marine reg. (1448H) Art. 3, Fourth (4), (12)
  8. Marine reg. (1448H) Art. 7, First (4)
  9. Marine reg. (1448H) Art. 7, First (1)
  10. Marine reg. (1448H) Art. 7, First (1)(a), (b)
  11. Marine reg. (1448H) Art. 7, First (1)(c)
  12. Marine reg. (1448H) Art. 7, First (1)(d), (e)
  13. Marine reg. (1448H) Art. 7, First (1)(f)
  14. Marine reg. (1448H) Art. 7, First (1)(g) to (l)
  15. Marine reg. (1448H) Art. 7, First (1)(m), (n)
  16. Marine reg. (1448H) Art. 7, Fifth (3)
  17. Marine reg. (1448H) Art. 7, First (2)
  18. Marine reg. (1448H) Art. 7, Second (1), (2)
  19. Marine reg. (1448H) Art. 7, Second (3), (4)
  20. Marine reg. (1448H) Art. 7, Second (5)
  21. Marine reg. (1448H) Art. 7, Second (6) and Table 1, row 44
  22. Marine reg. (1448H) Art. 7, Second (7)
  23. Marine reg. (1448H) Art. 7, Second (7)(a)
  24. Marine reg. (1448H) Art. 7, Second (7)(b)
  25. Marine reg. (1448H) Art. 7, Second (7)(c), (d)
  26. Marine reg. (1448H) Art. 7, Second (7)(e)
  27. Marine reg. (1448H) Art. 7, Third (1)
  28. Marine reg. (1448H) Art. 7, Third (2) to (4)
  29. Marine reg. (1448H) Art. 4(5)
  30. Marine reg. (1448H) Art. 6(4), (5)
  31. Marine reg. (1448H) Art. 5, First (8)
  32. Marine reg. (1448H) Art. 4(1) to (3)
  33. Marine reg. (1448H) Art. 7, Fifth (8)
  34. SP reg. (1446H) Art. 9(12) and Table 1, row 13
  35. Marine reg. (1448H) Art. 8(1)(a), (d)
  36. Marine reg. (1448H) Table 1 and Art. 8(1)(b), (c)
  37. Marine reg. (1448H) Table 2
  38. Marine reg. (1448H) Art. 8(1)(g)
  39. Marine reg. (1448H) Art. 8(1)(h)
  40. Marine reg. (1448H) Art. 8(1)(f)
  41. Marine reg. (1448H) Art. 8(1)(e)
  42. Marine reg. (1448H) Table 1
  43. Marine reg. (1448H) Table 3, rows 7 and 8
  44. Marine reg. (1448H) Table 1, row 19
  45. Marine reg. (1448H) Table 1, rows 38 and 39
  46. Marine reg. (1448H) Art. 8(1)(c) and Table 2
  47. Marine reg. Table 1 (2024), row 37
  48. Marine reg. (1448H) Table 1, row 43
  49. Marine reg. (1448H) Table 1, rows 35 and 37
  50. Marine reg. (1448H) Art. 7, Third and Table 1, row 46
  51. Marine reg. (1448H) Table 1, row 48
How to read these references 3 texts cited
  • Art. 7(4)(b) means Article 7, paragraph 4, item (b).
  • First, Second and Third are the numbered parts some articles are divided into. The Arabic texts write them أولاً، ثانياً، ثالثاً (meaning first, second, third).
  • Decision followed by a number is a ministerial or Council of Ministers decision. Most of the 1446H decisions replaced a regulation's penalty table.
  • H after a year marks the Hijri (Islamic calendar) year. 1446H ran from July 2024 to June 2025.

Every text we cite is listed on our regulations page.

Regulation texts this guide is written from

  • Executive Regulation for the Sustainable Management of the Marine and Coastal Environment (1448H update), approved by Ministerial Decision 481531028 dated 20/2/1448H (Umm Al-Qura, 21 August 2026)
  • Council of Ministers Decision 406 dated 14/5/1445H approving the statute of the General Foundation for the Conservation of Coral Reefs and Turtles in the Red Sea
  • Ministerial Decision 15029095 dated 4/2/1446H amending Table 1 of the marine and coastal regulation (replaced in 2026)
  • Executive Regulations for Environmental Permits to Establish and Operate Activities
  • Executive Regulation for Environmental Service Providers (1446H), Ministerial Decision 15150091 dated 22/6/1446H

This guide is general information written from the regulation texts listed above. It is not legal advice. Regulations change, and the official text always prevails. Spotted something out of date? Request a change.