We secure the permit to operate, prepare the audit studies NCEC asks for at renewal, and keep the monitoring reports on schedule.

Request a proposal

Overview

We are an NCEC Type A licensed consultancy that obtains and renews the NCEC environmental permit to operate for factories, plants and other operating facilities. We prepare the application, the environmental audit study NCEC asks for at renewal and the periodic environmental monitoring reports your permit requires, so your facility keeps operating legally.

A facility needs an NCEC permit to operate before it starts operating. NCEC sets its validity between 3 and 6 years, and Category 2 and 3 activities renew it with an environmental audit study.

We prepare the application, the audit studies and the periodic monitoring reports, and we track the renewal dates for you.

The renewal application goes to NCEC at least 30 days before the permit expires, and for Category 2 and 3 activities the audit study goes with it. NCEC may extend its review by up to 15 days and may visit the site to check the study against reality. Once the study is approved, you are committed to implementing its recommendations, and NCEC follows them up.Permit guide, controls section. Audit reg. (1446H) Art. 5, Second (1) and (3) to (6)

A permit to operate can run longer than 3 years where, in the previous period, the facility stayed within its standards, maintained its equipment and pollution controls, followed its management and emergency plans and met its permit conditions, or holds NCEC compliance certificates. The request needs an application for the longer period and an audit study.Permit guide, section 10 and section 10.1

In brief, from our library

A facility needs an NCEC permit to operate before it starts operating. NCEC sets its validity between 3 and 6 years. Category 2 and 3 activities renew it with an environmental audit study every 3 years, and the annual financial dues must be paid before renewal.Executive Regulations for Environmental Permits to Establish and Operate Activities

Read the full guide: Environmental permit to operate: validity and renewal

When you need it

  • Your facility is about to start operating.Permits reg.
  • Your permit is due for renewal. Category 2 and 3 activities submit an environmental audit study with each renewal, described as every 3 years.Permits reg. and Audit reg. (1446H)
  • NCEC has inspected your site, or asked for an audit or corrective action.Audit reg. (1446H)

What is included

  • Records reviewPrevious audits, EIAs, permits, maintenance records, incidents and complaints checked against the permit conditions.
  • Audit fieldworkInspection of the process, emission points, wastewater, waste areas and chemical storage, with sampling where results are needed.
  • Updated rehabilitation planThe rehabilitation plan brought up to date inside the audit study for Category 2 and 3 renewals.
  • Emergency self planThe emergency preparedness and response plan prepared or updated with the audit study.
  • Compliance action planEach non-conformity numbered, with its corrective action, cost, owner and planned closure date.
  • Stack test planningA test schedule for every stack, with notice to NCEC where the regulation asks for it.
  • Report submissionMonitoring reports uploaded on NCEC’s permits platform, from our provider account or yours.

What we deliver

  • Permit to operate applicationWith the previous permit, its conditions and the undertakings NCEC asks for.
  • Environmental audit studiesOn the template set by the audit regulation, by our licensed team.
  • Monitoring reportsAt the frequency your permit sets.
  • Stack testingAnnual emission measurements for point sources.
  • Renewal trackingDates, dues and documents planned well ahead.

How we work

  1. Check the conditions

    We review your current permit, its conditions and its expiry date.

  2. Audit the facility

    Our team audits the site and writes the study.

  3. Apply or renew

    NCEC decides on an audit study within 30 days. The annual financial dues must be paid before renewal.Audit reg. (1446H). Permits reg.

  4. Keep it current

    Monitoring and reporting continue on the permit’s schedule.

Sectors we serve

Frequently asked questions

What does an environmental audit study include?

The study follows the template in Appendix 1 of the 1446H audit regulation. It covers the applicable regulations, the surrounding environment, the process with its inputs, outputs, energy and water use, and environmental performance for air, wastewater, waste, noise, land use and incidents. It ends with a compliance plan of corrective measures and a self-inspection plan.Audit reg. (1446H) Art. 5, Second (1) and Appendix 1

How often must environmental monitoring reports be submitted to NCEC?

The frequency is a condition of your permit, which NCEC sets from the facility’s environmental impact, for example quarterly, semi-annual or annual. Reports cover the period from permit issue to the end of the permit. They must be prepared by an NCEC licensed provider, with sampling and measurements also by a licensed provider.Monitoring journey, slides 2, 4 and 5

Do diesel generators need annual stack testing?

The annual testing duty covers every point source not on continuous monitoring, and all of its stacks. The regulation has no limit written for diesel generators and does not exempt standby units. Its general standards, such as 20 percent opacity, apply wherever no specific standard is given. Missing annual tests is fined 10,000 to 100,000 riyals per year.Air reg. Art. 5, Fourth (1), Appendix 3, item 1, Appendix 4, Note (2) and Table 3 (2024)

Do we need a new permit to operate if we expand production?

Yes, before the change. A new permit to operate is required before changing the type or size of the activity, and the works themselves need a permit to establish first. NCEC may suspend a permit if major changes are made after it is issued, until the necessary adjustments are made.Permits reg. Art. 6, Second (1), Art. 6, Third (2) and Art. 9(6)

What is the fine for operating without a permit to operate?

Operating without an effective permit to operate is fined 10,000 riyals for Category 1, 20,000 riyals for Category 2 and 50,000 riyals for Category 3 activities. Separately, not developing a required audit study is fined 20,000 riyals, and not implementing its approved recommendations is fined 30,000 riyals.Permits reg. Art. 11, Table 2 (2024), item 4. Audit reg. (1446H) Art. 8, Table 1, items 9 and 10

Request a proposal

Send us the location and what you plan to build. We reply with the likely route, what it involves and a proposal.

Request a proposal

Guides on this topic

References

Show all 12 references
  1. Permits reg.
  2. Permits reg. and Audit reg. (1446H)
  3. Audit reg. (1446H)
  4. Audit reg. (1446H). Permits reg.
  5. Executive Regulations for Environmental Permits to Establish and Operate Activities
  6. Permit guide, controls section. Audit reg. (1446H) Art. 5, Second (1) and (3) to (6)
  7. Permit guide, section 10 and section 10.1
  8. Audit reg. (1446H) Art. 5, Second (1) and Appendix 1
  9. Monitoring journey, slides 2, 4 and 5
  10. Air reg. Art. 5, Fourth (1), Appendix 3, item 1, Appendix 4, Note (2) and Table 3 (2024)
  11. Permits reg. Art. 6, Second (1), Art. 6, Third (2) and Art. 9(6)
  12. Permits reg. Art. 11, Table 2 (2024), item 4. Audit reg. (1446H) Art. 8, Table 1, items 9 and 10
How to read these references 5 texts cited
  • Art. 7(4)(b) means Article 7, paragraph 4, item (b).
  • First, Second and Third are the numbered parts some articles are divided into. The Arabic texts write them أولاً، ثانياً، ثالثاً (meaning first, second, third).
  • H after a year marks the Hijri (Islamic calendar) year. 1446H ran from July 2024 to June 2025.

Every text we cite is listed on our regulations page.