Permit to operate and audits
We secure the permit to operate, prepare the audit studies NCEC asks for at renewal, and keep the monitoring reports on schedule.
Request a proposalOverview
A facility needs an NCEC permit to operate before it starts operating. NCEC sets its validity between 3 and 6 years, and Category 2 and 3 activities renew it with an environmental audit study.
We prepare the application, the audit studies and the periodic monitoring reports, and we track the renewal dates for you.
In brief, from our library
A facility needs an NCEC permit to operate before it starts operating. NCEC sets its validity between 3 and 6 years. Category 2 and 3 activities renew it with an environmental audit study every 3 years, and the annual financial dues must be paid before renewal.Executive Regulations for Environmental Permits to Establish and Operate Activities
Read the full guide: Environmental permit to operate: validity and renewal
When you need it
- Your facility is about to start operating.Permits reg.
- Your permit is due for renewal. Category 2 and 3 activities submit an environmental audit study with each renewal, described as every 3 years.Permits reg. and Audit reg. (1446H)
- NCEC has inspected your site, or asked for an audit or corrective action.Audit reg. (1446H)
What we deliver
- Permit to operate applicationWith the previous permit, its conditions and the undertakings NCEC asks for.
- Environmental audit studiesOn the template set by the audit regulation, by our licensed team.
- Monitoring reportsAt the frequency your permit sets.
- Stack testingAnnual emission measurements for point sources.
- Renewal trackingDates, dues and documents planned well ahead.
How we work
Check the conditions
We review your current permit, its conditions and its expiry date.
Audit the facility
Our team audits the site and writes the study.
Apply or renew
NCEC decides on an audit study within 30 days. The annual financial dues must be paid before renewal.Audit reg. (1446H). Permits reg.
Keep it current
Monitoring and reporting continue on the permit’s schedule.
Guides on this topic
References
Show all 5 references
- Permits reg.
- Permits reg. and Audit reg. (1446H)
- Audit reg. (1446H)
- Audit reg. (1446H). Permits reg.
- Executive Regulations for Environmental Permits to Establish and Operate Activities
How to read these references 2 texts cited
- Audit reg. (1446H)
- Executive Regulation for Environmental Inspections and Audits (1446H)
- Art. 7(4)(b) means Article 7, paragraph 4, item (b).
- H after a year marks the Hijri (Islamic calendar) year. 1446H ran from July 2024 to June 2025.
Every text we cite is listed on our regulations page.
Need help with this? Talk to our team.