Short answer
Every point source not covered by continuous monitoring must have all its stack emissions measured every year by an NCEC-licensed service provider, with first tests within 120 days of establishment or 40 days of reaching target production, whichever comes first. Boilers, furnaces and gas turbines have specific limits in Appendix 4, and sources listed in Appendix 5, such as gas turbines over 50 MW and combustion devices over 73 MW, need continuous emission monitoring. The regulation has no limit written specifically for diesel generators, and it states that general standards, such as 20 percent opacity, apply wherever no industry-specific standard is given. Missing annual tests is fined 10,000 to 100,000 riyals per year.
Key terms used in this guide 7 terms
- Environmental emergency
- An environmental incident that poses an immediate danger causing or threatening serious environmental damage, a threat to people, or destruction of ecosystems or wildlife habitats, and that needs urgent intervention to stop it becoming a disaster. The Audit regulation (1446H) uses a shorter definition: any operational incident within an activity or facility that threatens environmental habitats or harms the environment. Arabic: الطوارئ البيئية (meaning “environmental emergencies”) Emergency reg. Art. 1, Audit reg. (1446H) Art. 1
- Environmental impact assessment (EIA) study
- Study aimed at determining, estimating and evaluating the environmental impact of any activity classified by the Center as category 2 or 3, with the objective of incorporating environmental considerations into the final design of the activity, along with economic, social and security considerations, and identifying the necessary alternatives and measures to protect the environment. Arabic: دراسة تقييم الأثر البيئي (meaning “study of the assessment of the environmental impact”) Permits reg. Art. 1
- Environmental permit (general)
- Document issued by the Center to a person before undertaking an activity. Arabic: التصريح (meaning “the permit (authorisation)”) Permits reg. Art. 1
- Modification of an activity
- Any action that modifies the designs of the activity without changing the type of activity (translated from the Arabic guide). Arabic: تعديل نشاط (meaning “modification of an activity”) Permit guide, definitions
- Point source
- Permanent or semi-permanent activities resulting in the emission of air pollutants, such as industrial stacks, energy production plants, and the dust resulting from mining activities and construction works, amongst others. Arabic: المصادر الثابتة (meaning “the fixed (stationary) sources”) Air reg. Art. 1
- Serious violation
- A violation involving acts stipulated in Article 35 of the Environmental Law, acts that lead to environmental degradation, or acts that harm sensitive receptors or environmentally sensitive areas. Its penalty is proportional to the damage and is estimated by a committee of experts formed by the NCEC CEO. Arabic: المخالفات الجسيمة (meaning “the grave violations”) Permits reg. Art. 11(1) to (3)
- Service provider
- A person licensed by the competent authority to provide environmental services. The Audit regulation uses the singular مقدم الخدمة (meaning the service provider) for a person licensed by the Center. Arabic: مقدمو الخدمات (meaning “the service providers (those who provide the services)”) SP reg. (1446H) Art. 1 and Audit reg. (1446H) Art. 1
On this page
- Which emission standards apply to a stack?
- What limits apply to boilers, furnaces and gas turbines?
- Is there a specific limit for diesel generators?
- When is continuous emission monitoring required?
- How does annual stack testing work?
- What about start-up, shutdown, breakdowns and temporary exemptions?
- What are the penalties?
- What can go wrong?
Which emission standards apply to a stack?
Exceeding point source emission standards is prohibited. A source must meet the industry-specific standards in Appendix 4, and the general standards in Appendix 3 for any pollutant that Appendix 4 does not cover.Air reg. Art. 5, First (1)
The Appendix 3 general standards include:Air reg. Appendix 3
- Particulate opacity of no more than 20 percent for all sources.Air reg. Appendix 3, item 1
- No asbestos emissions.Air reg. Appendix 3, item 2
- Stockpile opacity of no more than 10 percent.Air reg. Appendix 3, item 3
- Total VOC equivalent to 20 mg/m³ of toluene for sources emitting more than 100 g/h of organic hazardous air pollutants.Air reg. Appendix 3, item 5
The opacity limit is written as 'should not exceed 20% of the normal level'. The regulation does not explain what 'normal level' means.Air reg. Appendix 3, item 1
Compliance with Appendix 4 is judged against hourly average data unless stated otherwise, corrected to standard conditions as specified by USEPA methods.Air reg. Appendix 4, Note (1)
What limits apply to boilers, furnaces and gas turbines?
Appendix 4 has separate rows for combustion facilities built before 1 September 2005 (row 12) and those built or modified after that date (row 13).Air reg. Appendix 4, rows 12 and 13
For facilities built or modified after 1 September 2005, the limits include:Air reg. Appendix 4, row 13
| Steam units or furnaces over 73 MW | PM 43 ng/J, SO2 340 ng/J, NOx 43 ng/J gas or 69 ng/J oil |
|---|---|
| Industrial or commercial units over 29 MW | PM 43 ng/J, SO2 215 or 340 ng/J by oil share, NOx 43 or 69 ng/J |
| Small units from 2.9 to 29 MW | SO2 215 ng/J |
| Gas turbines over 100 MW | NOx 9 ppmv at 15% O2 |
| Gas turbines from 10 to 100 MW | NOx 25 ppmv at 15% O2 |
| Gas turbines under 10 MW | NOx 42 ppmv at 15% O2 |
| Duct burners | NOx 86 ng/J gas or 130 ng/J oil |
Each gas turbine class also has an SO2 limit of 0.015 percent by volume at 15 percent O2 and a turbine fuel sulphur limit below 0.8 percent by weight.Air reg. Appendix 4, rows 13.14 to 13.22
For mixed fuels, the standard is prorated by the share of heat input from each fuel.Air reg. Appendix 4, Note (6)
Row 12.10, a 43 ng/J particulate limit for small units built before 2005, carries a reviewer comment in the published English text reading 'Not in the standards'. Its status is unclear.Air reg. Appendix 4, row 12.10
Table sourceAir reg. Appendix 4, rows 13.1 to 13.23
Is there a specific limit for diesel generators?
The regulation contains no emission standard written specifically for diesel generators or reciprocating engines. The combustion rows in Appendix 4 cover steam generating units, furnaces, gas turbines and duct burners.Air reg. Appendix 4, rows 12 and 13
Appendix 4 states that general standards apply to all emission sources unless individual facility standards are specified.Air reg. Appendix 4, Note (2)
Read together, these provisions point to the Appendix 3 general standards for a generator, including the 20 percent opacity limit. The regulation does not state this for generators in so many words.Air reg. Appendix 3, item 1
The annual testing duty applies to point sources not subject to continuous monitoring and covers all their stacks. The regulation does not mention standby or emergency generators and does not exempt them.Air reg. Art. 5, Fourth (1)
NCEC may set further requirements in permits, and breaching any air quality requirement it issues is fined 50,000 riyals per requirement.Air reg. Table 3 (2024), item 37
Check the environmental permit and monitoring plan for unit-specific conditions before booking a test. If you plan to test fewer units than you operate, get NCEC approval in writing first.
When is continuous emission monitoring required?
Sources listed in Appendix 5 must install NCEC-approved continuous emission monitoring. NCEC may also require it on other sources based on EIA, audit or inspection results.Air reg. Art. 5, Third (1) and (2)
Appendix 5 includes, among others:Air reg. Appendix 5
- Gas turbines over 50 MW heat input, for NOx.Air reg. Appendix 5, row 8
- Combustion devices over 73 MW heat input, for opacity, PM, SO2 and NOx.Air reg. Appendix 5, row 9
- Hazardous and medical waste incinerators, Portland cement plants, nitric and sulphuric acid plants and specified petroleum refinery units.Air reg. Appendix 5
Combustion sources burning only natural gas or hydrogen are exempt from continuous monitoring of opacity and SO2.Air reg. Appendix 5, Note (2)
A source can be exempted from continuous NOx monitoring if a performance test and later spot tests show NOx consistently below 70 percent of the standard for facilities built after 1 September 2005. This needs consecutive spot tests: 2 results below 50 percent, 3 below 60 percent, 4 below 70 percent, or 30 days below 70 percent with a portable continuous monitor. The tests must be at least 3 months apart and completed within 2 years.Air reg. Appendix 5, Note (3)
Operators with continuous monitoring must:
- Submit operating procedures to NCEC within 90 days of installation.Air reg. Art. 5, Third (10)
- Carry out relative accuracy or cylinder gas audits in three quarters and a relative accuracy test audit once a year.Air reg. Art. 5, Third (12)
- Use an NCEC-licensed service provider for audits and submit reports within 40 working days (reference method) or 10 working days (other methods).Air reg. Art. 5, Third (16)
- Fix defects found in an audit within 10 working days of the report.Air reg. Art. 5, Third (17)
- Use predictive monitoring (PEMS) instead of CEMS only with NCEC approval.Air reg. Art. 5, Third (7) and (9)
How does annual stack testing work?
Point sources without continuous monitoring must measure and analyse all their stack emissions every year for the primary pollutants in Appendices 3 and 4. NCEC may ask for additional measurements.Air reg. Art. 5, Fourth (1) and (2)
The main rules are:
- Each stack is measured separately. With NCEC approval, identical stacks can be sampled (1 of 1 to 3, 2 of 4 to 8, 3 of more than 8), but every stack must be tested at least once every 4 years.Air reg. Art. 5, Fourth (3)(a) and (b)
- First tests on all stacks are due within 120 days of establishment or 40 days of reaching target production, whichever comes first.Air reg. Art. 5, Fourth (3)(c)
- Sampling follows the latest USEPA methods unless NCEC sets others.Air reg. Art. 5, Fourth (6)
- Testing is done by an NCEC-licensed service provider, and NCEC may take part in supervising it.Air reg. Art. 5, Fourth (7) and (9)
- For non-primary sources, NCEC may reduce testing to every 4 years where a pollutant stayed 30 to 50 percent below its limit for 3 years, or to every 6 years (or cancel it) where it stayed at or below 50 percent of the limit.Air reg. Art. 5, Fourth (4)
A primary source is one with uncontrolled potential to emit more than 100 t/y of CO, NOx, SO2, PM or lead, more than 10 t/y of one hazardous organic air pollutant or 25 t/y combined, or any source burning hazardous material or waste.Air reg. Art. 5, Fourth (5)
For primary sources, NCEC must be notified 'within thirty (30) working days before' testing, and the results report is due within 40 working days of the test. The notice wording is ambiguous, and giving at least 30 working days of notice is the cautious reading.Air reg. Art. 5, Fourth (8) and (10)
The report for a primary source must include analytical and physical data, operating conditions during sampling, calculation methods, results and calibration data.Air reg. Art. 5, Fourth (10)
What about start-up, shutdown, breakdowns and temporary exemptions?
You must notify NCEC immediately of emergencies, start-up or shutdown that may breach point source emission standards.Air reg. Art. 5, First (5)
Table 1 of Article 5 exempts these cases from the emission standards:Air reg. Art. 5, First (6)
- Firefighting operations, at all times.Air reg. Art. 5, Table 1
- Emergencies and partial or full, permanent or temporary shutdowns, subject to NCEC evaluation if the excess lasts more than 6 hours.Air reg. Art. 5, Table 1
- Excesses allowed by NCEC under a temporary exemption permit.Air reg. Art. 5, Table 1
NCEC may verify that an emergency did not result from an environmental violation. Where exceedance continues for more than 6 hours it may take suitable measures, including approving or rejecting an extension.Air reg. Art. 5, First (6) and (7)
Records of start-ups, shutdowns, disruptions, failures, tests, calibration and maintenance must be kept for at least 5 years. NCEC may extend this by 5 years for some activities.Air reg. Art. 5, Fifth (1)(a)
If a source cannot meet a standard, the operator may apply for a temporary permit to exceed it. The technical study must include emission data, dispersion modelling, evidence that compliance is technically impossible, an economic analysis and an action plan with timelines and costs.Air reg. Art. 5, Second (1) and (2)
NCEC decides within 15 working days of registering the request, after collecting the study fees, and may extend this by 5 working days.Air reg. Art. 5, Second (4)
The fee ceiling for a permit to temporarily exceed point source emission standards is 11,000 riyals.Fees reg. Appendix 1, item 53
The permittee must submit periodic progress reports at the frequency NCEC sets.Air reg. Art. 5, Second (7)
What are the penalties?
Table 3 of the Air Quality regulation includes these fines for stacks and emission monitoring:Air reg. Table 3 (2024)
| Exceeding point source emission standards | 5,000 to 5,000,000 riyals |
|---|---|
| Not notifying NCEC immediately of an emergency or shutdown exceedance | 50,000 to 500,000 riyals, plus the exceedance fine |
| Not conducting annual stack tests | 10,000 to 100,000 riyals per year |
| Not meeting annual test requirements | 5,000 to 50,000 riyals per requirement |
| Not installing required continuous monitoring | 50,000 to 5,000,000 riyals |
| Not conducting CEMS audits | 10,000 to 200,000 riyals per year |
| Not keeping records as required | 10,000 to 100,000 riyals |
| Using an unlicensed service provider | 50,000 riyals |
| Missing temporary exemption progress reports | 20,000 to 100,000 riyals per report |
Not maintaining machinery and emission controls is fined 20,000 to 200,000 riyals, and not maintaining stacks 10,000 to 100,000 riyals.Air reg. Table 3 (2024), items 9 and 12
Serious violations are penalised in proportion to the damage, with the amount estimated by an expert committee formed by NCEC's CEO.Air reg. Art. 8(2) and (3)
A 1446H ministerial decision re-issued Table 3 without changing any amount. It classes every row as serious except row 11 (stacks not designed to the Article 6 controls, 50,000 riyals plus rectification), whose classification cell is blank.Decision 15029057 (1446H), Air reg. Table 3 (2024), row 11
Table sourceAir reg. Table 3 (2024), items 2, 7, 10, 13, 20, 22 to 25
What can go wrong?
These are the most common stack testing failures:
- Missing the first test deadline. The 40-day clock from target production can expire before the 120-day clock from establishment.Air reg. Art. 5, Fourth (3)(c)
- Testing only one of several identical stacks without NCEC approval, or never rotating to the others within 4 years.Air reg. Art. 5, Fourth (3)(b)
- Assuming generators fall outside the regulation because Appendix 4 has no generator row. Appendix 4 says general standards apply unless a specific standard is given.Air reg. Appendix 4, Note (2)
- Notifying NCEC late about a breakdown exceedance. This is a separate fine of 50,000 to 500,000 riyals on top of the exceedance fine.Air reg. Table 3 (2024), item 25
- Using a stack testing firm that is not licensed by NCEC, which is fined 50,000 riyals.Air reg. Table 3 (2024), item 2
- Discarding operating, test or calibration records before 5 years have passed.Air reg. Art. 5, Fifth (1)(a)
- Leaving CEMS audit defects unfixed beyond 10 working days from the report.Air reg. Art. 5, Third (17)
Hills & Field plans and coordinates stack emission testing, CEMS audits and the reports NCEC requires for operating facilities.
References
Each small number in this guide shows the article or section that point comes from. Hover over or tap a number to see it, or open the full list below.
Show all 53 references and the 3 regulation texts
- Air reg. Art. 5, First (1)
- Air reg. Appendix 3
- Air reg. Appendix 3, item 1
- Air reg. Appendix 3, item 2
- Air reg. Appendix 3, item 3
- Air reg. Appendix 3, item 5
- Air reg. Appendix 4, Note (1)
- Air reg. Appendix 4, rows 12 and 13
- Air reg. Appendix 4, row 13
- Air reg. Appendix 4, rows 13.1 to 13.23
- Air reg. Appendix 4, rows 13.14 to 13.22
- Air reg. Appendix 4, Note (6)
- Air reg. Appendix 4, row 12.10
- Air reg. Appendix 4, Note (2)
- Air reg. Art. 5, Fourth (1)
- Air reg. Table 3 (2024), item 37
- Air reg. Art. 5, Third (1) and (2)
- Air reg. Appendix 5
- Air reg. Appendix 5, row 8
- Air reg. Appendix 5, row 9
- Air reg. Appendix 5, Note (2)
- Air reg. Appendix 5, Note (3)
- Air reg. Art. 5, Third (10)
- Air reg. Art. 5, Third (12)
- Air reg. Art. 5, Third (16)
- Air reg. Art. 5, Third (17)
- Air reg. Art. 5, Third (7) and (9)
- Air reg. Art. 5, Fourth (1) and (2)
- Air reg. Art. 5, Fourth (3)(a) and (b)
- Air reg. Art. 5, Fourth (3)(c)
- Air reg. Art. 5, Fourth (6)
- Air reg. Art. 5, Fourth (7) and (9)
- Air reg. Art. 5, Fourth (4)
- Air reg. Art. 5, Fourth (5)
- Air reg. Art. 5, Fourth (8) and (10)
- Air reg. Art. 5, Fourth (10)
- Air reg. Art. 5, First (5)
- Air reg. Art. 5, First (6)
- Air reg. Art. 5, Table 1
- Air reg. Art. 5, First (6) and (7)
- Air reg. Art. 5, Fifth (1)(a)
- Air reg. Art. 5, Second (1) and (2)
- Air reg. Art. 5, Second (4)
- Fees reg. Appendix 1, item 53
- Air reg. Art. 5, Second (7)
- Air reg. Table 3 (2024)
- Air reg. Table 3 (2024), items 2, 7, 10, 13, 20, 22 to 25
- Air reg. Table 3 (2024), items 9 and 12
- Air reg. Art. 8(2) and (3)
- Decision 15029057 (1446H), Air reg. Table 3 (2024), row 11
- Air reg. Art. 5, Fourth (3)(b)
- Air reg. Table 3 (2024), item 25
- Air reg. Table 3 (2024), item 2
How to read these references 2 texts cited
- Art. 7(4)(b) means Article 7, paragraph 4, item (b).
- First, Second and Third are the numbered parts some articles are divided into. The Arabic texts write them أولاً، ثانياً، ثالثاً (meaning first, second, third).
- Decision followed by a number is a ministerial or Council of Ministers decision. Most of the 1446H decisions replaced a regulation's penalty table.
- H after a year marks the Hijri (Islamic calendar) year. 1446H ran from July 2024 to June 2025.
Every text we cite is listed on our regulations page.
Regulation texts this guide is written from
- Executive Regulation for Air Quality (Environmental Law, Royal Decree M/165)
- Ministerial Decision 15029057 dated 1446/02/04H amending Table 3 of the Air Quality regulation
- Executive Regulation for Financial Dues for Environmental Licenses, Permits and Services
This guide is general information written from the regulation texts listed above. It is not legal advice. Regulations change, and the official text always prevails. Spotted something out of date? Request a change.