28 penalty ranges from Table 3.1 of RCER-2025 Volume III, grouped by the Volume I section the clause sits in.

Table 3.1 gives a range for each clause of Volume I. The amount within the range depends on:

  • The violation class the Royal Commission decides, from Class 1 (minor) to Class 6 (catastrophic).RCER-2025 Vol. III, 3 and 3.1.1, page 3
  • Repeats within two years, which can raise the fine by a factor of 1.1 to the power (n − 1), where n is the number of incidents.RCER-2025 Vol. III, 3.1.2, page 3
  • Self-reporting and cooperating, which multiplies the total by 0.75. Total fines may not exceed the maximum in MEWA’s environmental law.RCER-2025 Vol. III, 3.2 and 3.3, page 4
  • Remedial costs, which are paid on top. Refusing to pay may lead to revocation of the EPO.RCER-2025 Vol. III, 3.4 and 3.5, page 4

Table 3.1 gives no currency. Volume III’s penalty notice form states fines in Saudi riyals (SR).RCER-2025 Vol. III, Appendix D, Penalty Notice of Non-Compliance, page 16 For how a fine is worked out and what to do when a notice arrives, read how the Royal Commission calculates a fine. NCEC fines are in the NCEC library.

  1. RCER-2025 Vol. III, 3 and 3.1.1, page 3
  2. RCER-2025 Vol. III, 3.1.2, page 3
  3. RCER-2025 Vol. III, 3.2 and 3.3, page 4
  4. RCER-2025 Vol. III, 3.4 and 3.5, page 4
  5. RCER-2025 Vol. III, Appendix D, Penalty Notice of Non-Compliance, page 16

Royal Commission environmental fines
ViolationFineReference
Permits and the regulatory system (Volume I, section 1)
Starting process construction without an EPC 5,000 to 50,000 riyals (monthly) RCER-2025 Vol. III, Table 3.1, clause 1.2.1, page 5
Reconstruction, modification or expansion of an existing facility without an EPC 200,000 to 500,000 riyals RCER-2025 Vol. III, Table 3.1, clause 1.2.2, page 5
Late PAP submission for the EPC 10,000 to 40,000 riyals RCER-2025 Vol. III, Table 3.1, clause 1.2.4, page 5
Operating or commissioning without a valid EPO 5,000 to 50,000 riyals (monthly) RCER-2025 Vol. III, Table 3.1, clause 1.3.1, page 5
Late EPO renewal 50,000 to 110,000 riyals RCER-2025 Vol. III, Table 3.1, clause 1.3.6, page 5
Modified facility without a new or amended EPO 10,000 to 40,000 riyals RCER-2025 Vol. III, Table 3.1, clause 1.3.7, page 5
Not operating in accordance with the EPO terms and conditions 1,000 to 10,000 riyals per condition, in addition to the fine of the relevant clause RCER-2025 Vol. III, Table 3.1, clause 1.3.9, page 5
Environmental studies or field tests not conducted by an RC approved third party 50,000 riyals RCER-2025 Vol. III, Table 3.1, clause 1.1.27a, page 5
No detailed decommissioning plan before closure 1,000 to 100,000 riyals RCER-2025 Vol. III, Table 3.1, clause 1.4.1, page 5
No closure site impact assessment by an RC approved third party, or premises not restored 200,000 to 500,000 riyals plus costs RCER-2025 Vol. III, Table 3.1, clause 1.4.3, page 5
Not notifying RC when process construction is approaching 30 days to final completion 10,000 to 40,000 riyals RCER-2025 Vol. III, Table 3.1, clause 1.2.6, page 5
Operating a modified or reconstructed facility without an amended or new EPO 5,000 to 50,000 riyals (monthly) RCER-2025 Vol. III, Table 3.1, clause 1.3.2, page 5
Air (section 2)
Not following dust control measures during construction or site preparation 10,000 to 40,000 riyals RCER-2025 Vol. III, Table 3.1, clause 2.3.9, page 5
Missing annual stack emission testing 10,000 to 100,000 riyals per annum per stack RCER-2025 Vol. III, Table 3.1, clause 2.5.1, page 5
Water and groundwater (section 3)
Discharging any water, including hydrotesting and dewatering water, to storm water channels or coastal waters without prior RC authorization 200,000 to 500,000 riyals RCER-2025 Vol. III, Table 3.1, clause 3.3.3, page 6
Discharging extracted groundwater without prior RC authorization 200,000 to 500,000 riyals RCER-2025 Vol. III, Table 3.1, clause 3.11.3, page 7
Contaminating groundwater 200,000 to 500,000 riyals RCER-2025 Vol. III, Table 3.1, clause 3.11.1, page 7
Using groundwater for any industrial purpose 120,000 to 180,000 riyals RCER-2025 Vol. III, Table 3.1, clause 3.11.2, page 7
New facility without the required permanent groundwater monitoring wells before operation 120,000 to 180,000 riyals RCER-2025 Vol. III, Table 3.1, clause 3.11.4, page 7
Missing the annual groundwater monitoring, the 90 day report or the 14 working day sampling notice 120,000 to 180,000 riyals RCER-2025 Vol. III, Table 3.1, clause 3.11.5, page 7
New facility without baseline groundwater monitoring and a baseline report before operation 120,000 to 180,000 riyals RCER-2025 Vol. III, Table 3.1, clause 3.11.6, page 7
Waste (section 5)
Industrial waste not treated or disposed of within 180 days 120,000 to 180,000 riyals RCER-2025 Vol. III, Table 3.1, clause 5.4.1, page 8
Soil (section 6)
Failing to report or falsifying soil contamination information 10,000 to 1.0 million riyals RCER-2025 Vol. III, Table 3.1, clause 6.2.5, page 8
Noise (section 8)
Missing the annual perimeter noise survey and report 120,000 to 180,000 riyals RCER-2025 Vol. III, Table 3.1, clause 8.2.2, page 9
Noise at the boundary fence above the Table 8 limits 5,000 to 10,000 riyals RCER-2025 Vol. III, Table 3.1, clause 8.2.1, page 9
Not giving RC at least 14 days notice of noise monitoring 10,000 to 40,000 riyals RCER-2025 Vol. III, Table 3.1, clause 8.2.5, page 9
Reporting and record keeping (section 9)
Not reporting a hazardous material spill or release that may affect groundwater or the environment outside the plant 200,000 to 500,000 riyals RCER-2025 Vol. III, Table 3.1, clause 9.2.7, page 9
Missing the Gap Analysis Report or quarterly Compliance Status Reports 30,000 riyals RCER-2025 Vol. III, Table 3.1, clause 9.2.5, page 9

Need help with this? Talk to our team. Spotted something out of date? Request a change.