Environmental monitoring in Saudi Arabia

We run the monitoring your permit requires, from dust and noise on construction sites to annual stack tests, and write the reports NCEC expects.

Request a proposal

Overview

We are an NCEC Type A licensed environmental monitoring company covering air quality, noise, dust, stack emissions and groundwater across Saudi Arabia. We run our own air quality monitoring station and noise level meters under our NCEC monitoring licence, with our own field teams, and we turn the results into the periodic monitoring reports your NCEC, Royal Commission or Saudi Aramco requirements call for.

Most permits come with monitoring conditions: what to measure, where and how often. The results go to NCEC in periodic monitoring reports, which must be prepared by an NCEC licensed provider, with the sampling and measurements also done by a licensed provider.

Our field teams carry out the monitoring and our consultants turn the results into reports that meet NCEC’s guide.

Stack testing has its own timetable. First tests on all stacks are due within 120 days of establishment or 40 days of reaching target production, whichever comes first. Each stack is then measured every year to the latest USEPA methods unless NCEC sets others. Where NCEC approves sampling a share of identical stacks, every stack must still be tested at least once every 4 years.Air reg. Art. 5, Fourth (3)(a) to (c) and (6)

In Royal Commission cities the schedule follows RCER-2025. Groundwater monitoring wells are sampled once a year unless the EPO says otherwise, with results due within 90 days of sampling. A facility with equipment above 85 dBA surveys its perimeter noise at least once a year and reports within 30 days.RCER-2025 Vol. I, 3.11.5 and 8.2.2

In brief, from our library

Environmental monitoring reports are mandatory where your permit conditions require them, and they cover the period from permit issue to the end of the permit. The frequency is set in the permit, for example quarterly, semi-annual or annual. The report must be prepared by an NCEC licensed provider, with sampling and measurements by an NCEC licensed provider, and the NCEC guide lists 13 required report elements. Monitoring data must be kept for at least 5 years under the Air Quality and Aqueous Media regulations and at least 3 years under the Noise regulation.NCEC guidance manual for the environmental monitoring report (CP-02-M-01-V01)

Read the full guide: What must an NCEC environmental monitoring report include?

When you need it

  • Your permit sets monitoring conditions, for example quarterly, semi-annual or annual reports.Monitoring report guide
  • You operate stacks or other point sources. Each must have its emissions measured every year unless it is under continuous monitoring.Air reg.
  • Your construction site needs dust and noise monitoring.Air reg. and Noise reg.

What is included

  • Ambient air qualityParticulate and gas measurements, including data from our own air quality monitoring station.
  • Attended and unattended noiseClass 1 noise monitoring by day and night, at site boundaries and at sensitive receptors.
  • Stack emission testingPoint source sampling for the primary pollutants, with operating conditions recorded during each test.
  • Construction dust and PM10Boundary dust and PM10 monitoring to support your CEMP and dust management plan.
  • Groundwater and discharge samplingMonitoring wells, dewatering discharges and treated effluent sampled and sent to licensed laboratories.
  • Exceedance follow-upResults above the assessment criteria highlighted and explained, with proposed actions.
  • Royal Commission and Saudi Aramco programmesMonitoring planned to RCER-2025 or Saudi Aramco requirements where they apply.

What we deliver

  • Ambient air and dustPM10, PM2.5 and gases.
  • Stack emissionsAnnual tests on point sources.
  • NoiseBoundary and receptor monitoring.
  • WaterGroundwater, surface water and discharge testing.
  • Monitoring reportsCovering every element in NCEC’s guide.

How we work

  1. Read the conditions

    We list every monitoring requirement in your permit.

  2. Set the programme

    Points, parameters and frequency.

  3. Measure

    Our teams sample and measure on schedule.

  4. Report

    Results checked against the limits and reported on time. Point source records and water monitoring data must be kept for at least 5 years.Air reg. Art. 5, Fifth (1)(a). Aqueous reg. Art. 6, Fourth (5)

Sectors we serve

Frequently asked questions

Can we install our own air quality monitors on site?

An ambient air quality monitoring network needs an NCEC licence, and its installation, operation and maintenance must be carried out by an NCEC licensed service provider. The licensee reports data to NCEC, notifies it of every exceedance and may not disclose data without NCEC's written consent. Our own air quality station and noise level meters operate under our NCEC monitoring licence. Talk to us before buying equipment, so the set-up meets these rules.Air reg. Art. 4, Third (1), (2), (7), (8) and (10)

Do diesel generators need stack testing?

The annual testing duty covers all stacks of point sources not under continuous monitoring, and the regulation does not exempt standby or emergency generators. It has no emission limit written specifically for generators, and general standards apply wherever no specific standard is given, including the 20 percent opacity limit. Check your permit for unit-specific conditions before booking a test.Air reg. Art. 5, Fourth (1). Air reg. Appendix 3, item 1 and Appendix 4, Note (2)

What happens if a monitoring result exceeds the limit?

It has to be reported and explained. For water discharges you must inform NCEC immediately after detecting an exceedance and stop the source. Emergencies, start-ups or shutdowns that may breach point source emission standards must also be notified immediately. In the monitoring report, every result above the assessment criteria is highlighted and discussed, with proposed actions.Aqueous reg. Art. 6, Fourth (4). Air reg. Art. 5, First (5). Monitoring report guide, Table, rows 6, 8 and 9

How does NCEC review a monitoring report?

NCEC assesses the report against your permit conditions, using the limits in the executive regulations together with the EIA, audit studies, environmental management plans and the monitoring report guide. Non-compliance falls into three groups: not meeting regulation requirements, not meeting permit conditions and exceeding regulation limits. Reports are uploaded on NCEC's permits and licences platform from the facility or provider account.Monitoring journey, slides 10 to 12 and 14

Do you monitor noise at night?

Yes. We operate attended and unattended Class 1 noise monitoring, so we can measure through the night as well as by day. The Noise regulation treats night-time as 8 pm to 7 am. Each measurement record includes the instrument serial numbers, calibration, location photographs and weather, as Appendix 1 of the regulation lists.Noise reg. Art. 1 and Appendix 1, First

Request a proposal

Send us the location and what you plan to build. We reply with the likely route, what it involves and a proposal.

Request a proposal

Guides on this topic

References

Show all 12 references
  1. Monitoring report guide
  2. Air reg.
  3. Air reg. and Noise reg.
  4. Air reg. Art. 5, Fifth (1)(a). Aqueous reg. Art. 6, Fourth (5)
  5. NCEC guidance manual for the environmental monitoring report (CP-02-M-01-V01)
  6. Air reg. Art. 5, Fourth (3)(a) to (c) and (6)
  7. RCER-2025 Vol. I, 3.11.5 and 8.2.2
  8. Air reg. Art. 4, Third (1), (2), (7), (8) and (10)
  9. Air reg. Art. 5, Fourth (1). Air reg. Appendix 3, item 1 and Appendix 4, Note (2)
  10. Aqueous reg. Art. 6, Fourth (4). Air reg. Art. 5, First (5). Monitoring report guide, Table, rows 6, 8 and 9
  11. Monitoring journey, slides 10 to 12 and 14
  12. Noise reg. Art. 1 and Appendix 1, First
How to read these references 6 texts cited
  • Art. 7(4)(b) means Article 7, paragraph 4, item (b).
  • First, Second and Third are the numbered parts some articles are divided into. The Arabic texts write them أولاً، ثانياً، ثالثاً (meaning first, second, third).

Every text we cite is listed on our regulations page.

Need help with this? Talk to our team.