Construction-phase environmental compliance

We keep construction sites inside their permit conditions: the management plan, the site controls, the monitoring and the records NCEC inspectors ask for.

Request a proposal

Overview

We are an NCEC Type A licensed consultancy that keeps construction sites compliant with their environmental permit. We write the construction environmental management plan (CEMP), or the CESMP where your contract asks for one, run dust, noise and water monitoring with our own field teams, and prepare the reports and records NCEC inspectors ask for. The service is for developers, main contractors and project managers from mobilisation to handover.

Once the permit to establish is issued, its conditions apply on site for the whole of construction. Dust, noise, water and waste each have their own limits and controls, and NCEC inspects sites against them.

We write the construction environmental management plan (CEMP or CESMP), set up the controls with your site team, run the monitoring and report on it, and support you when NCEC inspects.

In Riyadh, NCEC’s dust guideline asks every construction project to include a dust management plan in its CEMP. The plan is due at least 30 calendar days before mobilisation, and no dust-generating work may start before written approval. Medium and high-risk sites also need real-time PM10 monitoring, and excavation, grading, demolition and stockpile handling must stop when the wind is above 25 km/h.Dust guide, section 4.2, section 3.11 and Annex A

After an NCEC inspection, you carry out the immediate corrective measures NCEC sets and submit an action plan for the rest within 30 days of the results being issued. NCEC decides on the plan within 15 working days. Not developing the plan is fined 20,000 riyals and not implementing it 30,000 riyals.Audit reg. (1446H) Art. 4, Third (1) and (2), and Art. 8, Table 1, items 7 and 8

In brief, from our library

Noise limits depend on the zone around the site, from 50 dB by day and 40 dB at night in zone A up to 65 dB by day and 55 dB at night in zone D. Construction sites may exceed these limits only between 7 am and 6 pm, and only by a correction of up to 10 dB that shrinks as the activity gets longer. Work at night (8 pm to 7 am), or between 6 pm and 8 pm, must meet the plain zone limit unless NCEC issues a prior noise permit, which it decides within 5 working days of a complete application (extendable by 5) after fees are paid. Breaching the permitted times and limits is fined 5,000 to 10,000 riyals for each exceedance notice.Executive Regulation for Noise (Environmental Law, Royal Decree M/165)

Read the full guide: How loud can a construction site be, and can we work at night?

When you need it

  • Your site raises dust. Sites must cover or wet volatile materials, use dust-proof transport and stabilise haul routes, and failing the dust controls carries a fixed 50,000 riyal fine.Air reg. Table 3 (2024), item 36
  • You plan to work at night. From 8 pm to 7 am a site must meet the night limit of its zone unless NCEC issues a prior noise permit.Noise reg. Art. 7(1)
  • You need to pump out groundwater. Discharging it to the sea, land or surface water needs an NCEC permit.Aqueous reg.
  • Trees or shrubs must be cleared. On vegetation cover lands and in protected areas, this needs a prior licence or permit.Logging reg. Art. 1 and Art. 5(1)

What is included

  • Dust management planFor Riyadh projects, the plan inside the CEMP, with the site risk category, dust sources, controls and wind protocol.
  • Monitoring layoutPM10, noise and water monitoring points set around the site boundary and the nearest sensitive receivers.
  • Night work planningNight-time activities identified at programme stage, so the approvals and controls they need are in place before they start.
  • Site inspectionsRegular walkovers of stockpiles, haul routes, wheel washes, waste areas and fuel storage, with findings tracked to closure.
  • Subcontractor briefingsShort briefings so each subcontractor knows the controls that apply to its own work.
  • Incidents and complaintsRecords and follow-up when a complaint, spill or exceedance happens, so you can show NCEC what was done.
  • Demobilisation close-outStockpiles, exposed ground and site records closed out before handover.

What we deliver

  • CEMP or CESMPWritten around your permit conditions and your programme.
  • Site controlsDust, noise, water and waste measures agreed with your site team.
  • MonitoringDust, PM10, noise and water monitoring by our field teams.
  • Compliance reportingPeriodic reports in the format your permit asks for.
  • Permits during constructionNoise, dewatering and tree-clearing applications.
  • Inspection supportPreparation for NCEC visits and responses to any findings.

How we work

  1. Read the permit

    We turn every permit condition into a task, an owner and a record.

  2. Set up the site

    Controls, monitoring points and reporting are in place before the main works start.

  3. Monitor and report

    Our teams measure on the schedule your permit sets and report the results.

  4. Handle inspections

    We prepare the records and answer NCEC’s findings with you.

Sectors we serve

Frequently asked questions

What is a CEMP and who needs one?

A construction environmental management plan (CEMP) sets out how a site will meet its environmental permit conditions during construction: the controls for dust, noise, water and waste, the monitoring, the responsibilities and the records. We write it around your permit conditions and programme. In Riyadh, NCEC’s dust guideline expects every project’s dust management plan to sit inside the CEMP.Dust guide, section 4.2

What are the PM10 limits for construction sites in Saudi Arabia?

The Air Quality regulation limits ambient PM10 to 340 µg/m³ as a 24-hour average, with 12 exceedances allowed a year, and to 50 µg/m³ as an annual average. Natural events such as sandstorms are excluded from the standards, but a natural contribution must be demonstrated with measurements and modelling before it is subtracted.Air reg. Appendix 1 and its note ***, and Art. 4, First (3)

Who can carry out environmental monitoring on a construction site?

Construction dust counts as a point source under the Air Quality regulation, and measurements on point sources must be carried out by a service provider licensed by NCEC. Using an unlicensed provider is fined 50,000 riyals. Our own field teams measure dust, PM10, noise and water, and laboratory analysis comes from licensed providers.Air reg. Art. 1, Art. 5, Fourth (7) and Table 3 (2024), item 2

Can we publish our dust monitoring results?

Not without NCEC approval. Publishing air quality data or indicators without approval is fined 50,000 to 1,000,000 riyals, depending on the importance and amount of data, and the wording is not limited to monitoring network licensees. Treat dust readings in community updates, sustainability reports or marketing material as needing approval first.Air reg. Table 3 (2024), item 6

Does the main permit cover our camp and batch plant?

Only if they are on the same site. One environmental permit covers the main activity and its support activities on one site, so an off-site batch plant or camp falls outside it. Check its status before mobilising. An asphalt or concrete plant must also meet a particulate limit of 90 mg/dscm at all emission points.Permit guide, section 5(b). Air reg. Appendix 4, row 5.1

Request a proposal

Send us the location and what you plan to build. We reply with the likely route, what it involves and a proposal.

Request a proposal

Guides on this topic

References

Show all 12 references
  1. Air reg. Table 3 (2024), item 36
  2. Noise reg. Art. 7(1)
  3. Aqueous reg.
  4. Logging reg. Art. 1 and Art. 5(1)
  5. Executive Regulation for Noise (Environmental Law, Royal Decree M/165)
  6. Dust guide, section 4.2, section 3.11 and Annex A
  7. Audit reg. (1446H) Art. 4, Third (1) and (2), and Art. 8, Table 1, items 7 and 8
  8. Dust guide, section 4.2
  9. Air reg. Appendix 1 and its note ***, and Art. 4, First (3)
  10. Air reg. Art. 1, Art. 5, Fourth (7) and Table 3 (2024), item 2
  11. Air reg. Table 3 (2024), item 6
  12. Permit guide, section 5(b). Air reg. Appendix 4, row 5.1
How to read these references 7 texts cited
  • Art. 7(4)(b) means Article 7, paragraph 4, item (b).
  • First, Second and Third are the numbered parts some articles are divided into. The Arabic texts write them أولاً، ثانياً، ثالثاً (meaning first, second, third).
  • H after a year marks the Hijri (Islamic calendar) year. 1446H ran from July 2024 to June 2025.

Every text we cite is listed on our regulations page.

Need help with this? Talk to our team.