Search the site

Press Esc to close

  1. Home
  2. Environmental studies
  3. Due diligence and contaminated land

Phase I and II environmental site assessment

We assess the environmental condition and liabilities of a site or business before you buy, lend, lease or close.

Request a proposal

Overview

We are an NCEC Type A licensed environmental consultancy carrying out Phase I and Phase II environmental site assessment (ESA) for buyers, lenders, landlords and owners across Saudi Arabia. We find out what a site or business may be carrying, from contaminated soil and groundwater to missing permits and closure obligations, before you commit.

Environmental due diligence finds out what a site or business may be carrying: pollution, missing permits, open findings from NCEC, or closure obligations. It is usually done in phases, so you only pay for intrusive work when the first phase shows it is needed.

A Phase I assessment reviews records and inspects the site. A Phase II assessment samples soil and groundwater to confirm or rule out contamination. Phase III covers remediation planning and oversight where it is needed.

A Phase I assessment builds a picture of the site without sampling. We review its history, its permits and NCEC correspondence, and the records of storage, waste and spills, then inspect the site and interview the people who know it. For a remediation plan, NCEC's guidelines expect a site history covering at least the previous 10 years.Remediation guide, p. 14

A Phase II assessment samples soil and groundwater where Phase I points to a concern, to confirm or rule out contamination. Soil results are compared with Appendix 1 of the soil regulation for the site's grain size and land use, and levels above those standards mean the site has polluted soil.Soil reg. Art. 4(1) and (2)

In brief, from our library

Closure falls within the scope of the NCEC Permits regulation, and NCEC can write closure controls into the Permit to Operate. You apply for closure approval at least 30 days after the last production run, once all hazardous and non-hazardous waste has been disposed of through licensed providers. The application includes a closure plan with a timetable, a rehabilitation or remediation plan, waste disposal invoices and an undertaking, and the approval is valid for 120 days unless NCEC extends it. Violating closure controls carries 5,000, 20,000 or 50,000 riyals per requirement for Category 1, 2 or 3 activities.Executive Regulations for Environmental Permits to Establish and Operate Activities

Read the full guide: How do I close or decommission a facility in Saudi Arabia?

When you need it

  • You are acquiring, financing or leasing an industrial site or facility.
  • You are closing a facility, which needs a closure plan and a rehabilitation or remediation plan.Permits reg.
  • Contamination has been found, and a remediation plan must be prepared by an NCEC licensed provider.Soil reg.

What is included

  • Historical land usePast activities on and next to the site, from records, imagery and interviews.
  • Storage and waste areasTanks, chemical stores, drains and waste areas inspected for signs of leaks and spills.
  • Off-site sourcesNeighbouring activities that could have affected the site's soil or groundwater.
  • NCEC findings and penaltiesOpen inspection findings, violations and corrective actions on record.
  • Monitoring and reporting recordWhether periodic monitoring reports and audit studies were submitted as the permit requires.
  • Targeted sampling designPhase II sampling points placed on the concerns Phase I identified, not on a blanket grid.
  • Closure and rehabilitation exposureClosure, rehabilitation or remediation obligations and bank guarantee status where a facility is closing.

What we deliver

  • Phase I assessmentRecords review, site inspection and interviews.
  • Phase II assessmentSoil and groundwater sampling and analysis.
  • Phase IIIRemediation planning and oversight.
  • Compliance reviewPermits, conditions and NCEC findings checked against operations.
  • Liability summaryFindings ranked by risk and indicative cost to resolve.

How we work

  1. Scope

    We agree the questions the assessment must answer.

  2. Phase I

    Records, site visit and interviews.

  3. Phase II if needed

    Targeted sampling where Phase I points to a concern.

  4. Report

    Clear findings for decision makers, with next steps.

Sectors we serve

Frequently asked questions

When is a Phase II ESA needed?

A Phase II assessment is needed when Phase I points to a likely source of contamination, for example past fuel or chemical storage, spills or waste disposal on site. Working in phases means you only pay for intrusive sampling when the first phase shows it is needed. If Phase I finds no concern, the assessment can stop there.

Do I have to tell NCEC if contamination is found?

The soil regulation prohibits not informing NCEC as soon as soil pollution is detected during an activity. It gives no deadline in hours or days, and failing to inform carries 10,000 to 1,000,000 riyals. A remediation plan prepared by an NCEC licensed provider is then due within 10 working days, and clean-up may not start before NCEC approves it.Soil reg. Art. 7(7) and Table (1) item 7. Rehab reg. Art. 5, Third and Appendix 1, Second

Who pays to clean up a contaminated site?

The regulations apply the polluter-pays principle. Anyone whose action led to pollution must stop the source, decontaminate and rehabilitate the site, and pay compensation. That is why a record of site condition at the point of purchase or lease matters, because it shows what was there before you took over.Rehab reg. Art. 4(1) and (2)

Does due diligence check permits and NCEC compliance?

Yes. We check the facility's permits, their conditions and expiry dates, and any NCEC findings against how the site actually operates. Gaps matter. NCEC's model permit conditions state that a permit is void if the activity is changed, expanded or added to without prior notice to NCEC, and missing monitoring data carries a fine of 20,000 riyals.Permit guide, Appendix 1, item 10. Audit reg. (1446H) Art. 8, Table 1, row 12

Can a Phase I ESA be prepared for a lender or investor?

Yes. Lenders and investors often ask for environmental due diligence before financing or acquiring an industrial site or facility. We scope the assessment around the questions they need answered and report the findings ranked by risk, so credit and investment teams can act on them.

Request a proposal

Send us the location and what you plan to build. We reply with the likely route, what it involves and a proposal.

Request a proposal

Guides on this topic

References

Show all 8 references
  1. Permits reg.
  2. Soil reg.
  3. Executive Regulations for Environmental Permits to Establish and Operate Activities
  4. Remediation guide, p. 14
  5. Soil reg. Art. 4(1) and (2)
  6. Soil reg. Art. 7(7) and Table (1) item 7. Rehab reg. Art. 5, Third and Appendix 1, Second
  7. Rehab reg. Art. 4(1) and (2)
  8. Permit guide, Appendix 1, item 10. Audit reg. (1446H) Art. 8, Table 1, row 12
How to read these references 6 texts cited
  • Art. 7(4)(b) means Article 7, paragraph 4, item (b).
  • First, Second and Third are the numbered parts some articles are divided into. The Arabic texts write them أولاً، ثانياً، ثالثاً (meaning first, second, third).
  • H after a year marks the Hijri (Islamic calendar) year. 1446H ran from July 2024 to June 2025.

Every text we cite is listed on our regulations page.

Need help with this? Talk to our team.