Closure and rehabilitation

We prepare rehabilitation and remediation plans, handle camp removal and facility closure, and see the work through to NCEC’s completion notice.

Request a proposal

Overview

We are an NCEC Type A licensed consultancy that prepares rehabilitation plans, remediation plans and closure plans for NCEC approval. The service is for operators closing or decommissioning a facility, contractors demobilising a construction camp, and owners of sites where soil or groundwater contamination has been found. We take the work from site assessment to NCEC’s completion notice.

NCEC regulations require a rehabilitation plan in several situations: for Category 1 activities NCEC designates, inside every Category 2 and 3 EIA, after an incident that degrades a site, and whenever NCEC asks after an inspection or audit. The plan must be prepared by an NCEC licensed provider.

Approval of the plan is not the end. The bank guarantee is released only once the plan is implemented and a completion notice is issued, so we stay with the work until then.

A closure approval application includes a closure plan with a timetable, a rehabilitation or remediation plan, invoices for disposal of all waste through licensed providers and an undertaking to implement the plan. NCEC’s closure approval is valid for 120 days, and NCEC may extend it depending on the size of the activity.Permit guide, section 11.1 and section 11.2.1

The plan must be implemented by a provider licensed by NCEC for rehabilitation or remediation works, and the approval application attaches that contract and the waste transport and disposal contracts. During the works you submit progress reports with photographs, analysis results and an updated timeline, and any change to the plan needs NCEC approval first.Rehab guide, section 4(e) and (f). Rehab reg. Art. 7(1) and (2)

In brief, from our library

No NCEC regulation sets a rehabilitation trigger specific to construction camps, and some NCEC sector guidelines list worker camps only as temporary facilities whose land impacts must be mitigated. So the answer depends on which general trigger applies. A rehabilitation plan is required for Category 1 activities that NCEC designates, inside every Category 2 and 3 EIA, after an incident that degrades the site, and whenever NCEC asks after an inspection or audit. The plan must be prepared by an NCEC licensed provider, and after an incident or NCEC request you have 10 working days to submit it. Approval does not release the bank guarantee until the plan is implemented and a completion notice is issued.Executive Regulations for the Environmental Rehabilitation of Degraded Sites and Remediation of Polluted Sites

Read the full guide: Do we need a rehabilitation plan to remove a construction camp?

When you need it

  • NCEC has asked for a plan after an inspection, an audit or an incident. You then have 10 working days to submit it.Rehab reg.
  • You are demobilising a construction camp or closing a site.Rehab reg.
  • You are closing a facility. Closure approval is applied for at least 30 days after the last production run, once all waste has gone through licensed providers.Permits reg.
  • Soil pollution has been found. NCEC must be told straight away, and a remediation plan is due within 10 working days.Soil reg.

What is included

  • Site historyPast uses, waste disposal areas, fuel and chemical storage and visible staining recorded before any sampling.
  • Soil and groundwater samplingTrial pits, boreholes and wells where contamination is suspected, with analysis by licensed laboratories.
  • Land-use basisThe land-use column of the soil standards justified in writing before results drive decisions.
  • Removal scopeHow buildings, foundations, tanks, equipment and hazardous materials will be removed and disposed of.
  • Waste evidenceLicensed transport and disposal arranged, and every invoice kept for the closure application.
  • Cost and guaranteeThe cost of the works and the form of the financial guarantee set out in the plan.

What we deliver

  • Rehabilitation plansFor degraded sites, camps and closures.
  • Remediation plansFor polluted soil and groundwater.
  • Camp removalThe plan and the NCEC process for demobilisation.
  • Facility closureThe closure plan, timetable and supporting documents.
  • CompletionVerification and the evidence NCEC needs to issue the completion notice.

How we work

  1. Assess the site

    We survey the site and, where needed, sample soil and groundwater.

  2. Write the plan

    Rehabilitation or remediation, prepared by our licensed team.

  3. Approval

    Clean-up must not start before NCEC approves a remediation plan.Soil reg.

  4. Implement and close out

    We verify the work and support the completion notice.

Sectors we serve

Frequently asked questions

What must a rehabilitation plan contain?

The plan follows Appendix 2 of the rehabilitation regulation. Its chapters include land use after rehabilitation, site description, land stability, water recovery, wildlife and vegetation, chemicals and waste, facilities and equipment, public safety, monitoring, emergency management and cost. NCEC’s guideline also asks for land ownership documents and satellite images before and after rehabilitation.Rehab reg. Appendix 2. Rehabilitation plans guide, p. 14 and p. 17

How much does NCEC charge to review a rehabilitation plan?

The fees regulation caps the review fee at 2,000, 6,000 or 12,000 riyals per plan, depending on whether the degradation is limited, medium or significant. A management or rehabilitation plan submitted inside an EIA or an environmental audit study carries no extra review fee.Fees reg. Appendix 1, item 5. Permit guide, section 1(c)

When is soil considered contaminated in Saudi Arabia?

Soil counts as polluted when it exceeds the Appendix 1 standards of the soil regulation for its grain size and land use. Each grain class has columns for natural, agricultural, residential, commercial and industrial land. The standards do not apply where natural concentrations are shown to exceed them, and you then coordinate with NCEC on a solution.Soil reg. Art. 4(1) and (2), and Appendix 1 with its note

What happens if we start clean-up before NCEC approves the plan?

Implementing a rehabilitation or remediation plan before NCEC approves it is fined 10,000, 20,000 or 30,000 riyals for Category 1, 2 or 3. Not implementing an approved plan is fined 15,000, 30,000 or 100,000 riyals. Failing to inform NCEC as soon as soil pollution is detected carries 10,000 to 1,000,000 riyals.Rehab reg. Art. 8, Table 1 (2024), items 2 and 7. Soil reg. Table (1) item 7

Does our project’s EIA already cover rehabilitation of a camp?

It may. Every Category 2 and 3 EIA includes a rehabilitation plan, so if a camp or temporary site belongs to a project permitted on an EIA, that plan may already cover its removal. Read the EIA and the permit conditions before deciding what to submit. The plan must also be updated with each audit, after an incident and when NCEC asks.Rehab reg. Art. 5, First (1)(b) and (2)

Request a proposal

Send us the location and what you plan to build. We reply with the likely route, what it involves and a proposal.

Request a proposal

Guides on this topic

References

Show all 11 references
  1. Rehab reg.
  2. Permits reg.
  3. Soil reg.
  4. Executive Regulations for the Environmental Rehabilitation of Degraded Sites and Remediation of Polluted Sites
  5. Permit guide, section 11.1 and section 11.2.1
  6. Rehab guide, section 4(e) and (f). Rehab reg. Art. 7(1) and (2)
  7. Rehab reg. Appendix 2. Rehabilitation plans guide, p. 14 and p. 17
  8. Fees reg. Appendix 1, item 5. Permit guide, section 1(c)
  9. Soil reg. Art. 4(1) and (2), and Appendix 1 with its note
  10. Rehab reg. Art. 8, Table 1 (2024), items 2 and 7. Soil reg. Table (1) item 7
  11. Rehab reg. Art. 5, First (1)(b) and (2)
How to read these references 7 texts cited