Closure and rehabilitation

We prepare rehabilitation and remediation plans, handle camp removal and facility closure, and see the work through to NCEC’s completion notice.

Request a proposal

Overview

NCEC regulations require a rehabilitation plan in several situations: for Category 1 activities NCEC designates, inside every Category 2 and 3 EIA, after an incident that degrades a site, and whenever NCEC asks after an inspection or audit. The plan must be prepared by an NCEC licensed provider.

Approval of the plan is not the end. The bank guarantee is released only once the plan is implemented and a completion notice is issued, so we stay with the work until then.

In brief, from our library

No NCEC regulation sets a rehabilitation trigger specific to construction camps, and some NCEC sector guidelines list worker camps only as temporary facilities whose land impacts must be mitigated. So the answer depends on which general trigger applies. A rehabilitation plan is required for Category 1 activities that NCEC designates, inside every Category 2 and 3 EIA, after an incident that degrades the site, and whenever NCEC asks after an inspection or audit. The plan must be prepared by an NCEC licensed provider, and after an incident or NCEC request you have 10 working days to submit it. Approval does not release the bank guarantee until the plan is implemented and a completion notice is issued.Executive Regulations for the Environmental Rehabilitation of Degraded Sites and Remediation of Polluted Sites

Read the full guide: Do we need a rehabilitation plan to remove a construction camp?

When you need it

  • NCEC has asked for a plan after an inspection, an audit or an incident. You then have 10 working days to submit it.Rehab reg.
  • You are demobilising a construction camp or closing a site.Rehab reg.
  • You are closing a facility. Closure approval is applied for at least 30 days after the last production run, once all waste has gone through licensed providers.Permits reg.
  • Soil pollution has been found. NCEC must be told straight away, and a remediation plan is due within 10 working days.Soil reg.

What we deliver

  • Rehabilitation plansFor degraded sites, camps and closures.
  • Remediation plansFor polluted soil and groundwater.
  • Camp removalThe plan and the NCEC process for demobilisation.
  • Facility closureThe closure plan, timetable and supporting documents.
  • CompletionVerification and the evidence NCEC needs to issue the completion notice.

How we work

  1. Assess the site

    We survey the site and, where needed, sample soil and groundwater.

  2. Write the plan

    Rehabilitation or remediation, prepared by our licensed team.

  3. Approval

    Clean-up must not start before NCEC approves a remediation plan.Soil reg.

  4. Implement and close out

    We verify the work and support the completion notice.

Guides on this topic

References

Show all 4 references
  1. Rehab reg.
  2. Permits reg.
  3. Soil reg.
  4. Executive Regulations for the Environmental Rehabilitation of Degraded Sites and Remediation of Polluted Sites