Search the site

Press Esc to close

  1. Home
  2. Environmental studies
  3. Soil, groundwater and seawater testing

Soil and groundwater testing

We sample soil, groundwater and seawater, have them analysed by licensed laboratories and explain what the results mean for your project.

Request a proposal

Overview

We are an NCEC Type A licensed environmental consultancy providing soil and groundwater testing across Saudi Arabia, along with seawater and sediment sampling for coastal works. Our own field teams collect the samples, licensed laboratories analyse them, and we explain the results against the NCEC, Royal Commission or Saudi Aramco standards that apply to your site.

Soil and water results decide a lot on a project: whether dewatering water can be discharged, whether soil counts as polluted, and what remediation a site needs. Soil counts as polluted when it exceeds the standards for its grain size and land use.

We plan the sampling, collect the samples to recognised methods and compare the results with the standards that apply.

Soil results are read against Appendix 1 of the soil regulation. It splits soil into coarse soil, with grains of 75 μm or larger, and soft soil below that, and gives values for natural, agricultural, residential, commercial and industrial land. The column matters. For F1 hydrocarbons in coarse topsoil the agricultural value is 24 mg/kg against 270 mg/kg for commercial land. Where it is established that natural concentrations exceed the standards, they do not apply and you must coordinate with NCEC.Soil reg. Art. 1 and Appendix 1, including its note

Groundwater work follows set methods. In Royal Commission cities, wells are purged of at least three well volumes before sampling, and each batch of up to 20 samples needs a blind duplicate.RCER-2025 Vol. II, Appendix E, pages E-4 to E-7

In brief, from our library

You must inform NCEC as soon as soil pollution is detected, and failing to do so carries 10,000 to 1,000,000 riyals. Soil counts as polluted when it exceeds the Appendix 1 standards for its grain size and land use. A remediation plan prepared by an NCEC licensed service provider must be submitted within 10 working days, and NCEC decides within 10 working days. Starting the clean-up before NCEC approves the plan is itself a violation.Executive Regulation for the Prevention and Remediation of Soil Pollution

Read the full guide: What if we find contaminated soil during excavation?

When you need it

  • You need to discharge dewatering water and must show its quality.Aqueous reg.
  • You suspect or have found contaminated soil. NCEC must be told as soon as soil pollution is detected.Soil reg.
  • You are buying, selling or closing a site and need its condition on record.

What is included

  • Site history reviewPast uses, spills and storage areas that point to where contamination is most likely.
  • Borehole and trial pit samplingSoil samples at the surface and at depth, logged with location, depth and description.
  • Background comparisonUpgradient or reference samples to separate natural levels from contamination.
  • Quality control samplesDuplicates, blanks and chain of custody, so laboratory results can be relied on.
  • Land-use column selectionThe applicable soil standards agreed and justified in writing before results drive decisions.
  • Dewatering water characterisationPumped groundwater tested against the standards for the discharge route you plan.
  • Field recordsSampling points located, photographed and recorded with the conditions at the time of sampling.

What we deliver

  • Soil samplingSurface and borehole samples.
  • Groundwater samplingFrom wells and dewatering systems.
  • Seawater and sedimentFor coastal and marine works.
  • Laboratory analysisThrough licensed laboratories.
  • Interpretation reportResults set against the applicable standards, with next steps.

How we work

  1. Plan

    Sampling locations and parameters from the site history and the question to answer.

  2. Sample

    Collected and preserved to recognised methods.

  3. Analyse

    Licensed laboratory analysis.

  4. Explain

    What the results mean, and what you need to do next.

Sectors we serve

Frequently asked questions

Which standards apply to dewatering water?

It depends on where the water goes. Before discharge, treated wastewater must meet Appendix 2 of the aqueous media regulation for coastal and marine waters, or Appendix 3 for soil, land or surface water, and the discharge permit sets the standards that apply to you. The public sewer has its own limits under the treated sewage regulation, such as 600 mg/L of suspended solids.Aqueous reg. Art. 6, First (1) and Art. 8, Fourth (3). TSE reg. Table (1)

Who can test soil and groundwater for an NCEC submission?

Measurements and laboratory analyses must come from providers licensed by NCEC for those services. Water monitoring and analysis before discharge must go through an NCEC approved service provider, and laboratory analyses are a separate licensed service type. Check that the laboratory holds that service type on its NCEC certificate before samples are sent.Aqueous reg. Art. 6, Fourth (2) and (3). SP reg. (1446H) Art. 4(14) and Art. 6(8)

Do topsoil and deeper soil have different limits?

For some parameters, yes. Hydrocarbon fractions and BTEX have separate values for topsoil and subsurface soil in Appendix 1 of the soil regulation. The regulation does not define the depth that separates the two, so we record sample depths carefully and state in the report which values we applied and why.Soil reg. Appendix 1

How long must soil and groundwater data be kept?

Water monitoring, measurement and analysis data must be kept for at least 5 years, and NCEC may extend this by another 5 years. You must also keep up-to-date records of the measures taken on soil pollution and provide soil data whenever NCEC asks for it.Aqueous reg. Art. 6, Fourth (5). Soil reg. Art. 6(3) and (4)

Do you test seawater and marine sediment?

Yes. We sample seawater and seabed sediment for coastal and marine works, and compare the results with the criteria that apply to your project. Data on the marine and coastal environment may not be published without the Ministry's written approval under the 1448H marine regulation, so results stay within the permit process unless that approval is obtained.Marine reg. (1448H) Art. 7, Fifth (8)

Request a proposal

Send us the location and what you plan to build. We reply with the likely route, what it involves and a proposal.

Request a proposal

Guides on this topic

References

Show all 10 references
  1. Aqueous reg.
  2. Soil reg.
  3. Executive Regulation for the Prevention and Remediation of Soil Pollution
  4. Soil reg. Art. 1 and Appendix 1, including its note
  5. RCER-2025 Vol. II, Appendix E, pages E-4 to E-7
  6. Aqueous reg. Art. 6, First (1) and Art. 8, Fourth (3). TSE reg. Table (1)
  7. Aqueous reg. Art. 6, Fourth (2) and (3). SP reg. (1446H) Art. 4(14) and Art. 6(8)
  8. Soil reg. Appendix 1
  9. Aqueous reg. Art. 6, Fourth (5). Soil reg. Art. 6(3) and (4)
  10. Marine reg. (1448H) Art. 7, Fifth (8)
How to read these references 6 texts cited
  • Art. 7(4)(b) means Article 7, paragraph 4, item (b).
  • First, Second and Third are the numbered parts some articles are divided into. The Arabic texts write them أولاً، ثانياً، ثالثاً (meaning first, second, third).
  • H after a year marks the Hijri (Islamic calendar) year. 1446H ran from July 2024 to June 2025.

Every text we cite is listed on our regulations page.

Need help with this? Talk to our team.