Search the site

Press Esc to close

  1. Home
  2. Library
  3. Fines

What are the fines for environmental violations in Saudi Arabia?

How NCEC environmental fines are set, which ones are highest and most common, when they double, when a case goes to the Public Prosecution and how to object.

NCEC rules. 9 min read.

Short answer

Under the Environmental Law, an administrative fine can reach 20,000,000 riyals, with suspension of the permit for up to six months or its revocation. NCEC itself imposes fines of up to 100,000 riyals from the penalty table attached to each executive regulation, and larger cases go to a Violations Review Committee. The Article 35 acts, such as discharging untreated wastewater or disposing of hazardous waste in the environment, are crimes punishable by up to 10 years in prison and a fine of up to 30,000,000 riyals. Objections to an NCEC fine follow the rules and procedures of the Violations Review Committees.

Key terms used in this guide 12 terms
Category 1 activities
Activities expected to produce low environmental impact that does not exceed the perimeter of the activity's site. Arabic: أنشطة الفئة الأولى (meaning “activities of the first category”) Permits reg. Art. 4(4), First
Compensation
Monetary amount paid by the person who causes the damage, pollution or environmental degradation, to compensate for or eliminate the resulting deterioration. It includes rehabilitation expenses if the person causing the damage did not carry out the rehabilitation. Arabic: التعويضات (meaning “the compensations”) Aqueous reg. Art. 1
Competent authority
The Ministry, any of the national centres for the environment sector, or the Public Foundation for the Conservation of Coral Reefs and Turtles in the Red Sea, each within its mandate and as the regulations set. Council of Ministers Decision 406 added the Foundation to the Environmental Law definition. The Audit regulation (1446H) uses the same definition. Arabic: الجهة المختصة (meaning “the competent (specialised) authority”) Env Law Art. 1 as amended by Council of Ministers Decision 406 (1445H), Third, Audit reg. (1446H) Art. 1
Environmental degradation
Severe damage to the environment caused by the depletion of natural resources, the destruction of natural habitats, the extinction of wildlife species, or the pollution of environmental media and the deterioration of air, water and soil quality. Arabic: التدهور البيئي (meaning “environmental deterioration”) Permits reg. Art. 1
Environmental rehabilitation
Any procedure conducted on an environmentally degraded site or one that is affected by environmental damage or pollution, to restore its natural state of environmental balance, in accordance with the standards set by the competent authority. Arabic: إعادة التأهيل البيئي (meaning “environmental re-qualification (restoring to a fit state)”) Rehab reg. Art. 1
Environmentally sensitive areas
Areas with environmental significance whose degradation has negative repercussions for the environment. They include protected areas, parks, forests, wetlands, significant bird habitat, mangroves, landscaped sites, watersheds, water catchment and run-off areas, beaches, waterways, aquifers or any other area identified or declared as environmentally sensitive by the State, the Ministry or the national environmental centers. Arabic: المناطق الحساسة بيئياً (meaning “areas sensitive environmentally”) Permits reg. Art. 1
Point source
Permanent or semi-permanent activities resulting in the emission of air pollutants, such as industrial stacks, energy production plants, and the dust resulting from mining activities and construction works, amongst others. Arabic: المصادر الثابتة (meaning “the fixed (stationary) sources”) Air reg. Art. 1
Sensitive receptors
Receptors that are likely to be severely affected by activity or project due to their geographical proximity or sensitive nature. They include environmental elements, living species, archeological, cultural and religious sites, and community groups (such as endangered species, hospitals, elder care centers, schools, residential complexes, and others). Arabic: المستقبلات الحساسة (meaning “the sensitive receivers”) Permits reg. Art. 1
Serious violation
A violation involving acts stipulated in Article 35 of the Environmental Law, acts that lead to environmental degradation, or acts that harm sensitive receptors or environmentally sensitive areas. Its penalty is proportional to the damage and is estimated by a committee of experts formed by the NCEC CEO. Arabic: المخالفات الجسيمة (meaning “the grave violations”) Permits reg. Art. 11(1) to (3)
Service provider
A person licensed by the competent authority to provide environmental services. The Audit regulation uses the singular مقدم الخدمة (meaning the service provider) for a person licensed by the Center. Arabic: مقدمو الخدمات (meaning “the service providers (those who provide the services)”) SP reg. (1446H) Art. 1 and Audit reg. (1446H) Art. 1
Treated wastewater
Wastewater emerging from a treatment plant or a treatment process, which was treated to reduce the adverse environmental impact in compliance with specific environmental standards and requirements. Arabic: مياه الصرف المعالجة (meaning “treated drainage water”) Aqueous reg. Art. 1
Wastewater
Water whose use has changed its color, taste, odor, or level of health or environmental security. This includes water used for health, industrial or agricultural purposes, including cooling water and water from desalination plants (brine). Arabic: مياه الصرف (meaning “drainage water”) Aqueous reg. Art. 1

All 49 terms in the NCEC glossary

On this page
  1. How are environmental fines set?
  2. What makes a violation serious?
  3. What are the highest and most common fines?
  4. Can fines be doubled or charged every day?
  5. When does a case go to the Public Prosecution?
  6. How do you object to an NCEC fine?
  7. Does reporting a violation yourself help?
  8. What can go wrong?

How are environmental fines set?

The Environmental Law allows one or more of three administrative penalties for any breach of the Law or its regulations. These are a fine of up to 20,000,000 riyals, suspension of the licence or permit for up to six months, or revocation.Env Law Art. 38(1)

Each executive regulation has its own violations table, and penalties are imposed from those tables. The Minister classifies violations taking into account their nature and gravity and any aggravating or mitigating circumstances.Env Law Art. 38(2)

Who decides depends on the amount:

  • The competent authority, which is NCEC for matters in its remit, imposes fines of up to 100,000 riyals.Violations reg. (1446H) Art. 4, First (3)
  • Fines above 100,000 riyals are imposed by the Violations Review Committee.Violations reg. (1446H) Art. 4, First (3)
  • Under the Environmental Law the Committee can impose fines of up to 20,000,000 riyals, suspend a licence or permit for up to six months, or revoke it.Env Law Art. 38(1) and 39(2)
  • Committee decisions with fines above 5,000,000 riyals, or cancelling a licence or permit, need approval from the Minister or the chairman of the board of the competent authority, as the case may be.Violations reg. (1446H) Art. 4, First (5)

Committee decisions must be reasoned and passed by majority. The penalty tables set by the Minister take into account the nature and gravity of each violation and any aggravating or mitigating circumstances.Env Law Art. 39(2), Violations reg. (1446H) Art. 4, First (2)

What makes a violation serious?

The Permits regulation treats a violation as serious if it involves an Article 35 act of the Law, causes environmental degradation, or harms sensitive receptors or environmentally sensitive areas.Permits reg. Art. 11(3)

A serious violation gets a penalty proportional to the degree of damage, the size and importance of the damaged site and the economic and social consequences. A committee of experts formed by a decision of the NCEC CEO estimates that penalty.Permits reg. Art. 11(1) and (2)

The Aqueous Media, Soil and Rehabilitation regulations use the same three tests and the same expert committee.Aqueous reg. Art. 9(3)

The Air Quality regulation uses only the degradation and sensitive receptor tests.Air reg. Art. 8(4)

On 5 Sep 2024, 13 ministerial decisions (1446H) re-issued or amended the penalty tables of 13 executive regulations. The 12 tables printed in the gazette add a type of violation column, and the Vegetation decision adds definitions of serious and non-serious violations. The Permits, Aqueous Media, Noise, Soil, Rehabilitation and ODS tables class every row as serious, and the Air Quality table classes 36 of its 37 rows as serious. The Hunting, Wildlife, Protected Areas and Logging tables keep some rows non-serious or subject to a warning first. See the separate post on the 1446H decisions for what this does and does not change.Decision 15029124 (1446H)

The Audit regulation (1446H) and the Service Providers regulation (1446H) set serious violation fines by the degree of damage, the natural importance and area of the damaged site, the type of receptors affected and the economic and social effects. Both oblige the violator to correct the violation, repair the damage and pay compensation.Audit reg. (1446H) Art. 8(2) and (3), SP reg. (1446H) Art. 12(2) and (3)

The Emergency regulation adds a fourth test. A violation is also serious if the violator acted intentionally. A committee of specialists formed by the NCEC CEO estimates the fine.Emergency reg. Art. 11(3) and (4)

The Emergency regulation treats its Table 1 amounts as maximums. NCEC sets each fine by the nature and gravity of the violation and any aggravating or mitigating circumstances, and may issue one or more warnings before imposing a fine.Emergency reg. Art. 11(1) and (6)

The Marine regulation (1448H) also treats its table amounts as maximums. Non-serious violations cost individuals 25 percent of the Table 1 amount and businesses 25 to 100 percent by business size.Marine reg. (1448H) Art. 8(1)(a) to (c) and Table 2

What are the highest and most common fines?

The table below lists the highest fines and the fines most likely to arise on a typical project or facility, in riyals. Each row names the regulation table and row it comes from.Violations reg. (1446H) Art. 4 First (1)

Permits Table 2, row 2: activity without a permit5,000 / 20,000 / 50,000 (Category 1 / 2 / 3)
Permits Table 2, row 6: permit condition not met1,000 / 2,000 / 10,000 per requirement
Permits Table 2, row 1: incorrect information1,000 to 100,000 plus Public Prosecution
Air Table 3, row 7: point source emission standards exceeded5,000 to 5,000,000
Air Table 3, row 2: unlicensed service provider used50,000
Air Table 3, row 36: dust control measures not followed50,000
Air Table 3, row 37: air permit or licence requirement50,000 per requirement
Noise Table 5, row 3: noise limits or permitted times5,000 to 10,000 per exceedance notice
Noise Table 5, row 7: noise permit conditions5,000 to 20,000 per requirement
Aqueous Table 2, row 1: Article 5 prohibitions10,000 to 20,000,000
Aqueous Table 2, row 8: discharge without a permit50,000 to 20,000,000
Aqueous Table 2, row 2: treated wastewater standards10,000 to 5,000,000
Audit Table 1, row 2: inspectors refused entry20,000
Audit Table 1, row 8: corrective action plan not implemented30,000
Service providers Table 1, row 1: services without a licence5,000 to 50,000
Service providers Table 1, row 2: forged licence documents10,000 to 250,000 plus Public Prosecution
Soil Table 1, row 1: damaging or polluting soil20,000 to 10,000,000
Soil Table 1, row 7: soil pollution not reported10,000 to 1,000,000
Rehab Table 1, row 2: plan not implemented15,000 / 30,000 / 100,000 (Category 1 / 2 / 3)

Many rows count each requirement or notice separately. A permit with several unmet conditions therefore attracts one fine per condition.Permits reg. Art. 11, Table 2 (2024), row 6

Almost every row also obliges the violator to rectify the violation, repair the damage and pay compensation. Compensation is calculated separately from the fine.Permits reg. Art. 11, Table 2 (2024)

Check the right table

Each regulation has its own penalty table. Identify which regulation the breach falls under before estimating your exposure, because the same kind of failure can carry very different amounts in different tables.

Table sourceViolations reg. (1446H) Art. 4 First (1)

Can fines be doubled or charged every day?

Yes. The Law gives the committees four extra powers beyond the basic fine:Env Law Art. 38(3)(a) to (d)

  • A petition to the competent court to order confiscation of the seized items involved in the violation.Env Law Art. 38(3)(d)
  • A fine for each day the violation continues after the violator is notified of the committee's decision.Env Law Art. 38(3)
  • Doubling of the fine and suspension for a repeat within one year of the previous penalty decision becoming final.Env Law Art. 38(3)
  • Publication of a summary of the decision in a local newspaper at the violator's expense.Env Law Art. 38(3)

The 1446H Violations regulation no longer repeats the doubling rule, but it remains in the Environmental Law for a repeat within one year of the previous penalty decision becoming final.Env Law Art. 38(3)(b)

Compensation is paid within 90 days of notice. It covers direct losses and indirect losses such as government and private response costs, effects on public health, tourism and investment, societal anxiety and the cost of rehabilitation.Violations reg. (1446H) Art. 5(2) and (6)

If you carry out the rehabilitation yourself, its cost is deducted from the compensation.Violations reg. (1446H) Art. 5(5)

The competent authority calculates the compensation and may use experts and technical specialists from inside or outside the authority.Violations reg. (1446H) Art. 5(4)

Compensation collected is deposited in the Environment Fund. Money from selling seized items also goes to the Fund once the decision or judgment on them is final.Violations reg. (1446H) Art. 5(7) and Art. 7, Second

The 1448H marine regulation goes further for marine and coastal violations. A repeat of the same violation within one year doubles the penalty.Marine reg. (1448H) Art. 8(1)(h)

When does a case go to the Public Prosecution?

Four acts are crimes under Article 35 of the Law, investigated by the Public Prosecution and tried in court:Env Law Art. 42

  • Discarding, discharging or injecting untreated wastewater or liquids into wells, environmental media or aquifer outcrops, for any reason.Env Law Art. 35
  • Discharges of ballast water, cargo residues and similar pollutants from ships.Env Law Art. 35
  • Disposing of hazardous waste in environmental media.Env Law Art. 35
  • Killing, hunting or trading endangered wildlife species.Env Law Art. 35

These acts carry imprisonment of up to 10 years and a fine of up to 30,000,000 riyals, or either penalty. Repeating certain vegetation and wildlife offences within one year is also a crime.Env Law Art. 40

Court referral does not prevent NCEC from also imposing the administrative penalties in its regulations.Violations reg. (1446H) Art. 4 Third

Several penalty tables also order referral to the Public Prosecution for false information. These include Permits Table 2 row 1, Audit Table 1 row 1, Rehab Table 1 row 1 and Service providers Table 1 rows 2 and 12.Audit reg. (1446H) Art. 8, Table 1, row 1

How do you object to an NCEC fine?

Fines imposed by the competent authority can be objected to before the Committee, under the rules and procedures for the work of the committees that review Environmental Law violations. The 1446H regulation itself sets no objection period.Violations reg. (1446H) Art. 6, Env Law Art. 39(2)

The 1446H regulation no longer says what happens if the Committee does not reply, so check the Committee rules.Violations reg. (1446H) Art. 6

Committee decisions can be challenged before the administrative court.Env Law Art. 39(4)

Objections to permit decisions follow a different route. They go to NCEC in writing within 15 working days, and late objections are not accepted.Permits reg. Art. 10(1)

Does reporting a violation yourself help?

It can. Under the Audit regulation, the competent authority may give the violator an opportunity or a grace period to correct the violation before the penalty is applied, where the violator disclosed it voluntarily or reported it itself. This is discretionary and follows controls approved by the Minister or the chairman of the board, as the case may be.Audit reg. (1446H) Art. 8(4)

The Marine regulation (1448H) contains the same rule for marine and coastal violations.Marine reg. (1448H) Art. 8(1)(f)

For non-serious violations in the marine Table 1, the Centre may also issue more than one warning, extend the period or postpone the fine where correcting the violation needs more time. This needs acceptable technical reasons and continuing corrective action. The regulation does not say which national centre this means.Marine reg. (1448H) Art. 8(1)(g)

What can go wrong?

These are the most common ways a fine becomes larger or harder to challenge:

What can go wrong
  • Each unmet permit condition is a separate fine, so a single inspection can produce several fines at once.Permits reg. Art. 11, Table 2 (2024), row 6
  • Missing any objection deadline set in the Committee rules may cost you the objection route to the Committee. The 1446H regulation itself sets no period.Violations reg. (1446H) Art. 6
  • Relying on the old 60 day silence and court periods. They are not in the 1446H regulation, so confirm the current periods in the Committee rules.Violations reg. (1446H) Art. 6
  • Paying the fine does not end the matter. The violator must still remove the impacts, rehabilitate the site and pay compensation within 90 days of notice.Violations reg. (1446H) Art. 5(1) and (2)
  • A court case for an Article 35 act and NCEC administrative penalties can both apply to the same act.Violations reg. (1446H) Art. 4 Third
  • Non-Saudi violators are referred to the regional Emirate, which considers deporting them at their own expense.Violations reg. (1446H) Art. 4, Fourth
  • A repeat within one year can double the fine and the suspension period.Env Law Art. 38(3)
  • Using an unlicensed consultant or laboratory for air work is itself a 50,000 riyal violation.Air reg. Art. 8, Table 3 (2024), row 2
  • Where a violation needs urgent action to avert an environmental disaster, the activity can be suspended wholly or partly for up to 15 days as a preventive measure, before any Committee decision.Env Law Art. 44
Received an NCEC violation report or worried about your exposure?

Hills & Field reviews your permits and site practices against each penalty table, prepares corrective action plans and supports objections with technical evidence.

Our service: Permit to operate and audits

Talk to our team

References

Each small number in this guide shows the article or section that point comes from. Hover over or tap a number to see it, or open the full list below.

Show all 43 references and the 11 regulation texts
  1. Env Law Art. 38(1)
  2. Env Law Art. 38(2)
  3. Violations reg. (1446H) Art. 4, First (3)
  4. Env Law Art. 38(1) and 39(2)
  5. Violations reg. (1446H) Art. 4, First (5)
  6. Env Law Art. 39(2), Violations reg. (1446H) Art. 4, First (2)
  7. Permits reg. Art. 11(3)
  8. Permits reg. Art. 11(1) and (2)
  9. Aqueous reg. Art. 9(3)
  10. Air reg. Art. 8(4)
  11. Decision 15029124 (1446H)
  12. Audit reg. (1446H) Art. 8(2) and (3), SP reg. (1446H) Art. 12(2) and (3)
  13. Emergency reg. Art. 11(3) and (4)
  14. Emergency reg. Art. 11(1) and (6)
  15. Marine reg. (1448H) Art. 8(1)(a) to (c) and Table 2
  16. Violations reg. (1446H) Art. 4 First (1)
  17. Permits reg. Art. 11, Table 2 (2024), row 6
  18. Permits reg. Art. 11, Table 2 (2024)
  19. Env Law Art. 38(3)(a) to (d)
  20. Env Law Art. 38(3)(d)
  21. Env Law Art. 38(3)
  22. Env Law Art. 38(3)(b)
  23. Violations reg. (1446H) Art. 5(2) and (6)
  24. Violations reg. (1446H) Art. 5(5)
  25. Violations reg. (1446H) Art. 5(4)
  26. Violations reg. (1446H) Art. 5(7) and Art. 7, Second
  27. Marine reg. (1448H) Art. 8(1)(h)
  28. Env Law Art. 42
  29. Env Law Art. 35
  30. Env Law Art. 40
  31. Violations reg. (1446H) Art. 4 Third
  32. Audit reg. (1446H) Art. 8, Table 1, row 1
  33. Violations reg. (1446H) Art. 6, Env Law Art. 39(2)
  34. Violations reg. (1446H) Art. 6
  35. Env Law Art. 39(4)
  36. Permits reg. Art. 10(1)
  37. Audit reg. (1446H) Art. 8(4)
  38. Marine reg. (1448H) Art. 8(1)(f)
  39. Marine reg. (1448H) Art. 8(1)(g)
  40. Violations reg. (1446H) Art. 5(1) and (2)
  41. Violations reg. (1446H) Art. 4, Fourth
  42. Air reg. Art. 8, Table 3 (2024), row 2
  43. Env Law Art. 44
How to read these references 9 texts cited
  • Art. 7(4)(b) means Article 7, paragraph 4, item (b).
  • First, Second and Third are the numbered parts some articles are divided into. The Arabic texts write them أولاً، ثانياً، ثالثاً (meaning first, second, third).
  • Decision followed by a number is a ministerial or Council of Ministers decision. Most of the 1446H decisions replaced a regulation's penalty table.
  • H after a year marks the Hijri (Islamic calendar) year. 1446H ran from July 2024 to June 2025.

Every text we cite is listed on our regulations page.

Regulation texts this guide is written from

  • Environmental Law
  • Executive Regulation for Apprehension of Violations and Imposition of Penalties
  • Executive Regulations for Environmental Permits to Establish and Operate Activities
  • Executive Regulation for Air Quality
  • Executive Regulation for Noise
  • Executive Regulations for the Protection of Aqueous Media from Pollution
  • Executive Regulation for Environmental Inspections and Audits
  • Executive Regulation for Environmental Service Providers
  • Executive Regulation for the Prevention and Remediation of Soil Pollution
  • Executive Regulations for the Environmental Rehabilitation of Degraded Sites and Remediation of Polluted Sites
  • Ministerial Decision 15029124 (1446H)

This guide is general information written from the regulation texts listed above. It is not legal advice. Regulations change, and the official text always prevails. Spotted something out of date? Request a change.