Who needs it
Facilities that will construct permanent groundwater monitoring wells.RCER-2025 Vol. II, Form PA-W9, page W9-1
What the form covers
- Baseline groundwater quality, for new facilities only
- Proposed locations of the permanent groundwater monitoring wells
- Design and construction details of the wells
SourceRCER-2025 Vol. II, Form PA-W9, page W9-1
Documents the form asks for
- Reports on the baseline groundwater quality
SourceRCER-2025 Vol. II, Form PA-W9, page W9-1
Before you submit
- Answer every question. Where one does not apply, write “None” or “NA”.RCER-2025 Vol. II, Section 2.1(b) to (e) (page 8)
- Put the forms in the order of Figure 2.RCER-2025 Vol. II, Section 2, Figure 2 (page 10)
- An authorised representative of the facility signs and stamps the Statement of Certification.RCER-2025 Vol. II, Section 2.1(b) to (e) (page 8)
- Submit the application in electronic and printed form, with the printed copy signed.RCER-2025 Vol. II, Section 2.1(b) to (e) (page 8)
- Drawings go in as A3 hard copies and as PDF files.RCER-2025 Vol. II, Section 1.3.1 (page 3)