Who needs it
Facilities that will generate, store, pre-treat or dispose of waste.RCER-2025 Vol. II, Form PA-H2, pages H2-1 to H2-4
What the form covers
- Municipal waste generation and disposal
- Non-hazardous industrial waste generation
- Hazardous industrial waste generation
- Hazardous and non-hazardous industrial waste analysis data
- Waste handling and storage
- Waste pre-treatment and disposal
SourceRCER-2025 Vol. II, Form PA-H2, pages H2-1 to H2-4
Before you submit
- Answer every question. Where one does not apply, write “None” or “NA”.RCER-2025 Vol. II, Section 2.1(b) to (e) (page 8)
- Put the forms in the order of Figure 2.RCER-2025 Vol. II, Section 2, Figure 2 (page 10)
- An authorised representative of the facility signs and stamps the Statement of Certification.RCER-2025 Vol. II, Section 2.1(b) to (e) (page 8)
- Submit the application in electronic and printed form, with the printed copy signed.RCER-2025 Vol. II, Section 2.1(b) to (e) (page 8)
- Drawings go in as A3 hard copies and as PDF files.RCER-2025 Vol. II, Section 1.3.1 (page 3)
The Royal Commission provides the electronic copy of the forms. This page explains the form. The RC's version is the one to fill in and submit.RCER-2025 Vol. II, Section 2.1(b) to (e) (page 8)
This page summarises the form as published in RCER-2025, Volume II. It is general information, not legal advice. The Royal Commission's official form and regulations always prevail. Spotted something out of date? Request a change.